RMV 30-Inch CMLC Cow Camp and Gibby Road Project
Sukut is installing approximately 2,100 linear feet of backbone ...
Read More
Porter Ranch Tract 50506 Grading and Drainage Project
Sukut is performing 245,000 cubic yards of remedial grading and 195,000 ...
Read More
La Mesa Summit Rough Grading Project
On this project, Sukut performed earthwork and drainage work to prepare ten ...
Read More
RMV PA-3.2B, 3.3, 3.4 Rough Grading and Storm Drain Improvements Project
Sukut is executing grading and storm drain improvements for the development ...
Read More
Cielo Vista Rough Grading, Bridge, and Line D Storm Drain Improvements Project
This project consists of two portions: rough grading and bridge and RCB ...
Read More
The Terraces at Walnut Project
Sukut performed the rough grading, including the excavation of 2.2 million ...
Read More
Westlake Phase 2 Lake 2 Construction Project
As a general contractor on this project, Sukut oversaw the dewatering, ...
Read More
Westlake Village K and Lake 3 Project
As the general contractor on this project, Sukut is managing the ...
Read More
Rienda Zones A and 1 Tank Site and Pipelines Project
Sukut performed work that consisted of constructing the Rienda interim ...
Read More
Monte Verde Project
Sukut’s scope of work on this Northern California fast-paced project ...
Read More
San Marcos Highlands Grading Project
This residential rough grading project for KB Home involved earthmoving ...
Read More
The Highlands at Tesoro del Valle Project
This rough grading project is located on the 400-acre site and involved ...
Read More
RMV Rienda Storm Drain Project
This project involved the installation of a large RCP storm drain up to, ...
Read More
Cow Camp Road Phase 2B and SMVD Improvements Project
The Cow Camp Road 2B Roadway & SMWD Improvements project in Rancho ...
Read More
FedEx Ontario Airport Taxiway A Project
Sukut was awarded the FedEx Ontario Airport Taxiway A project in Ontario, ...
Read More
Montebello Hills Grading Phases A and B Project
This project includes 3.7 million cubic yards of remedial grading and 5.6 ...
Read More
RMV PA 3.1 and CCR Rough Grading Project
Project included mass excavation of 3,000,000 cubic yards and nearly ...
Read More
Los Patrones Parkway Improvements Phase 2 Project
The project included the restoration of median and shoulder grading for ...
Read More
FedEx Ontario Airport Expansion Project
On this project, Sukut handled 450,000 cubic yards of over-excavation and ...
Read More
Orchard Hills, Rough Grading And Storm Drain
Sukut moved over three million cubic yards of dirt and rock to create 223 ...
Read More
Hidden Canyon PA 18
Sukut moved over 3.2 million cubic yards of dirt and rock to create 258 ...
Read More
Thompson Ranch
This 3.8-million cubic yard residential grading project was a great success ...
Read More
Moorpark William Lyon Homes, Tract #5187
This residential grading project was located on a 350-acre land west of ...
Read More
St. John’s Seminary Rough Grading Project
This Southern California residential development project involved over two ...
Read More
Spencer’s Crossing – Tracts 37053-2 and 37053
This rough grading project was located in Murrieta within the County of ...
Read More

Rancho Mission Viejo The Ranch – PA 2.3 ,2.4 Los Patrones Grading and Storm Drain
Sukut installed 12,000 linear feet of storm drain ranging from 18” to 72”. ...
Read More
Rolling Hills Country Club Grading and Storm Drain
This project involved the transforming of the existing golf course and ...
Read More
Porter Ranch Project
This hillside residential grading project was the last phase of the Porter ...
Read More
Los Olivos Basin
Los Olivos Basin project involves the construction of multiple improvements ...
Read More
Serrano Summit Rough Grading Project
Sukut Construction was awarded the Serrano Summit Rough Grading project, ...
Read More
Hyundai-Kia Proving Ground
Sukut graded and paved a 6.5-mile oval test track for the Hyundai/Kia ...
Read More
Harmony Grove Project
This rough grading project for Standard Pacific included 3,000,000 cubic ...
Read More
Lake Forest Drive – Phase 2
The project consisted of 26 acres of grading work that included rough ...
Read More
Crystal Cove
Sukut won the ASCE Project of the Year Award after moving 30 million cubic ...
Read More
Pelican Hill Golf Course and Resort
In 1990, Sukut built the world-renowned Pelican Hill golf course. In 2005, ...
Read More
Spectrum 5 at Serrano Creek
Sukut is known to complete a difficult project on time and in very adverse ...
Read More
Marshburn Storm Drain and South Channel Improvements
The land where the storm drain project was located was being leased by a ...
Read More
Headlands Reserve
Located on the beautiful beaches of Dana Point, Headlands Reserve is now ...
Read More


Audie Murphy Ranch
The development of 650 acres into 800 housing lots included 10 million ...
Read More
Portola Springs
This project was to rough grade a housing tract under a tight deadline. ...
Read More
Walnut Hills – Three Oaks Project
Sukut moved more than 17 million cubic yards of dirt to create 268 mountain ...
Read More

Dos Lagos 18 Hole Golf Course
Sukut reclaimed the long-abandoned dumping ground site with an innovative ...
Read More