Projects
![](https://sukut.com/wp-content/uploads/2024/05/RMV-Tract-19227-Flood-and-Storm-Drain-Improvements-Project-670x400.jpg)
RMV Tract 19227 Flood and Storm Drain Improvements Project
This project involves constructing a series of five water ...
Read More![](https://sukut.com/wp-content/uploads/2023/03/RMV-30-Inch-CMLC-Cow-Camp-and-Gibby-Road-670x400.jpg)
RMV 30-Inch CMLC Cow Camp and Gibby Road Project
Sukut is installing approximately 2,100 linear feet of backbone ...
Read More![](https://sukut.com/wp-content/uploads/2023/03/San-Juan-Meadows-Rough-Grading-and-Storm-Drain-Project-670x400.jpg)
San Juan Meadows Rough Grading and Storm Drain Project
On this project, Sukut is performing mass grading, partial landfill ...
Read More![](https://sukut.com/wp-content/uploads/2022/03/4-670x400.jpg)
Cielo Vista Rough Grading, Bridge, and Line D Storm Drain Improvements Project
Sukut performed the remedial grading and mass excavation of this 34-acre ...
Read More![](https://sukut.com/wp-content/uploads/2021/11/2-670x400.jpg)
The Terraces at Walnut Project
Sukut performed the rough grading, including the excavation of 2.2 million ...
Read More![](https://sukut.com/wp-content/uploads/2021/08/03012022_A3A3576-670x400.jpg)
Westlake Phase 2 Lake 2 Construction Project
As a general contractor on this project, Sukut oversaw the dewatering, ...
Read More![](https://sukut.com/wp-content/uploads/2021/06/Rienda-Zones-A-and-1-Tank-Site-and-Pipelines-Project-670x400.jpg)
Rienda Zones A and 1 Tank Site and Pipelines Project
Sukut performed work that consisted of constructing the Rienda interim ...
Read More![](https://sukut.com/wp-content/uploads/2021/04/San-Marcos-Highlands-Grading-Project-website-670x400.jpg)
San Marcos Highlands Grading Project
This residential rough grading project for KB Home involved earthmoving ...
Read More![](https://sukut.com/wp-content/uploads/2021/03/TDV-0433-670x400.jpg)
The Highlands at Tesoro del Valle Project
This rough grading project is located on the 400-acre site and involved ...
Read More![](https://sukut.com/wp-content/uploads/2020/04/RMV200309-28295-670x400.jpg)
Cow Camp Road Phase 2B and SMVD Improvements Project
The Cow Camp Road 2B Roadway & SMWD Improvements project in Rancho ...
Read More![](https://sukut.com/wp-content/uploads/2019/11/Montebello-main-website-project-photojpg-670x400.jpg)
Montebello Hills Grading Phases A and B Project
This project includes 3.7 million cubic yards of remedial grading and 5.6 ...
Read More![](https://sukut.com/wp-content/uploads/2019/11/RMV-0258-670x400.jpg)
RMV PA 3.1 and CCR Rough Grading Project
Project included mass excavation of 3,000,000 cubic yards and nearly ...
Read More![](https://sukut.com/wp-content/uploads/2019/04/fedex1-670x400.jpg)
FedEx Ontario Airport Expansion Project
On this project, Sukut handled 450,000 cubic yards of over-excavation and ...
Read More![](https://sukut.com/wp-content/uploads/2019/03/1130-Hidden-Canyon-670x400.jpg)
Hidden Canyon PA 18
Sukut moved over 3.2 million cubic yards of dirt and rock to create 258 ...
Read More![](https://sukut.com/wp-content/uploads/2018/08/1190-RMV-The-Ranch-PA-2.3-and-2.4-670x400.jpg)
Rancho Mission Viejo The Ranch – PA 2.3 ,2.4 Los Patrones Grading and Storm Drain
Sukut installed 12,000 linear feet of storm drain ranging from 18” to 72”. ...
Read More![](https://sukut.com/wp-content/uploads/2018/07/Rolling-Hills-Grading-1183-2-670x400.jpg)
Rolling Hills Country Club Grading and Storm Drain
This project involved the transforming of the existing golf course and ...
Read More![](https://sukut.com/wp-content/uploads/2018/07/000-NY-Times-Shot-670x400.jpg)
Porter Ranch Project
This hillside residential grading project was the last phase of the Porter ...
Read More![](https://sukut.com/wp-content/uploads/2014/12/Hyundai-Kia-Test-Track-119_12x9-670x400.jpg)
Hyundai-Kia Proving Ground
Sukut graded and paved a 6.5-mile oval test track for the Hyundai/Kia ...
Read More![](https://sukut.com/wp-content/uploads/2014/09/1_5-670x400.jpg)
Harmony Grove Project
This rough grading project for Standard Pacific included 3,000,000 cubic ...
Read More![](https://sukut.com/wp-content/uploads/2014/04/Crystal-Cove-15DEC03_014_RJ-670x400.jpg)
Crystal Cove
Sukut won the ASCE Project of the Year Award after moving 30 million cubic ...
Read More![](https://sukut.com/wp-content/uploads/2014/04/Pelican-Hill-670x400.jpg)
Pelican Hill Golf Course and Resort
In 1990, Sukut built the world-renowned Pelican Hill golf course. In 2005, ...
Read More![](https://sukut.com/wp-content/uploads/2009/08/STH_06NOV06_030-670x400.jpg)
Headlands Reserve
Located on the beautiful beaches of Dana Point, Headlands Reserve is now ...
Read More![](https://sukut.com/wp-content/uploads/2007/01/Walnut-Hills-2-670x400.jpg)
Walnut Hills – Three Oaks Project
Sukut moved more than 17 million cubic yards of dirt to create 268 mountain ...
Read More![](https://sukut.com/wp-content/uploads/2004/12/Dos-Lagos-670x400.jpg)
Dos Lagos 18 Hole Golf Course
Sukut reclaimed the long-abandoned dumping ground site with an innovative ...
Read More