Projects

RMV 30-Inch CMLC Cow Camp and Gibby Road Project

Sukut is installing approximately 2,100 linear feet of backbone ...

Read More

Porter Ranch Tract 50506 Grading and Drainage Project

Sukut is performing 245,000 cubic yards of remedial grading and 195,000 ...

Read More

La Mesa Summit Rough Grading Project

On this project, Sukut performed earthwork and drainage work to prepare ten ...

Read More

RMV PA-3.2B, 3.3, 3.4 Rough Grading and Storm Drain Improvements Project

Sukut is executing grading and storm drain improvements for the development ...

Read More

Cielo Vista Rough Grading, Bridge, and Line D Storm Drain Improvements Project

This project consists of two portions: rough grading and bridge and RCB ...

Read More

The Terraces at Walnut Project

Sukut performed the rough grading, including the excavation of 2.2 million ...

Read More

Westlake Phase 2 Lake 2 Construction Project

As a general contractor on this project, Sukut oversaw the dewatering, ...

Read More

Westlake Village K and Lake 3 Project

As the general contractor on this project, Sukut is managing the ...

Read More

Rienda Zones A and 1 Tank Site and Pipelines Project

Sukut performed work that consisted of constructing the Rienda interim ...

Read More

Monte Verde Project

Sukut’s scope of work on this Northern California fast-paced project ...

Read More

San Marcos Highlands Grading Project

This residential rough grading project for KB Home involved earthmoving ...

Read More

The Highlands at Tesoro del Valle Project

This rough grading project is located on the 400-acre site and involved ...

Read More

RMV Rienda Storm Drain Project

This project involved the installation of a large RCP storm drain up to, ...

Read More

Cow Camp Road Phase 2B and SMVD Improvements Project

The Cow Camp Road 2B Roadway & SMWD Improvements project in Rancho ...

Read More

FedEx Ontario Airport Taxiway A Project

Sukut was awarded the FedEx Ontario Airport Taxiway A project in Ontario, ...

Read More

Montebello Hills Grading Phases A and B Project

This project includes 3.7 million cubic yards of remedial grading and 5.6 ...

Read More

RMV PA 3.1 and CCR Rough Grading Project

Project included mass excavation of 3,000,000 cubic yards and nearly ...

Read More

Los Patrones Parkway Improvements Phase 2 Project

The project included the restoration of median and shoulder grading for ...

Read More

FedEx Ontario Airport Expansion Project

On this project, Sukut handled 450,000 cubic yards of over-excavation and ...

Read More

Orchard Hills, Rough Grading And Storm Drain

Sukut moved over three million cubic yards of dirt and rock to create 223 ...

Read More

Hidden Canyon PA 18

Sukut moved over 3.2 million cubic yards of dirt and rock to create 258 ...

Read More

Thompson Ranch

This 3.8-million cubic yard residential grading project was a great success ...

Read More

Moorpark William Lyon Homes, Tract #5187

This residential grading project was located on a 350-acre land west of ...

Read More

St. John’s Seminary Rough Grading Project

This Southern California residential development project involved over two ...

Read More

Spencer’s Crossing – Tracts 37053-2 and 37053

This rough grading project was located in Murrieta within the County of ...

Read More

Hollywood Hills

Project included construction and operation of 4,300 linear feet of ...

Read More

Rancho Mission Viejo The Ranch – PA 2.3 ,2.4 Los Patrones Grading and Storm Drain

Sukut installed 12,000 linear feet of storm drain ranging from 18” to 72”.  ...

Read More

Rolling Hills Country Club Grading and Storm Drain

This project involved the transforming of the existing golf course and ...

Read More

Porter Ranch Project

This hillside residential grading project was the last phase of the Porter ...

Read More

Los Olivos Basin

Los Olivos Basin project involves the construction of multiple improvements ...

Read More

Serrano Summit Rough Grading Project

Sukut Construction was awarded the Serrano Summit Rough Grading project, ...

Read More

Hyundai-Kia Proving Ground

Sukut graded and paved a 6.5-mile oval test track for the Hyundai/Kia ...

Read More

Harmony Grove Project

This rough grading project for Standard Pacific included 3,000,000 cubic ...

Read More

Lake Forest Drive – Phase 2

The project consisted of 26 acres of grading work that included rough ...

Read More

Crystal Cove

Sukut won the ASCE Project of the Year Award after moving 30 million cubic ...

Read More

Pelican Hill Golf Course and Resort

In 1990, Sukut built the world-renowned Pelican Hill golf course. In 2005, ...

Read More

Spectrum 5 at Serrano Creek

Sukut is known to complete a difficult project on time and in very adverse ...

Read More

Marshburn Storm Drain and South Channel Improvements

The land where the storm drain project was located was being leased by a ...

Read More

Headlands Reserve

Located on the beautiful beaches of Dana Point, Headlands Reserve is now ...

Read More

Otay Quarry

This quarry is located adjacent to the Sleep Train Amphitheater in Chula ...

Read More

Summit Crest

Sukut graded the six acre hillside project at Pittsford and Osterman in ...

Read More

Audie Murphy Ranch

The development of 650 acres into 800 housing lots included 10 million ...

Read More

Portola Springs

This project was to rough grade a housing tract under a tight deadline. ...

Read More

Walnut Hills – Three Oaks Project

Sukut moved more than 17 million cubic yards of dirt to create 268 mountain ...

Read More

Kohl Ranch

A marshy track of property needed grading to create usable land for a ...

Read More

Dos Lagos 18 Hole Golf Course

Sukut reclaimed the long-abandoned dumping ground site with an innovative ...

Read More

Stone Crest

This project consisted of the grading of 98 acres of land and the ...

Read More

© 2023 Sukut Construction, LLC. All Rights Reserved.

Designed and managed by mediadozer.com

CALL NOW