Cajon Air Center Drainage Project

On this project, Sukut installed approximately 3,000 feet of concrete pipe in the location of the existing earthen swale used for stormwater conveyance, and 820 feet of an additional RCB from the center of the new concrete pipe, connecting to an underground detention basin. The project also included the installation of separated ingress and egress…Read more

Canyon Country Community Center Project

On this project, Sukut performed the following work: clear and grub, demolition of an existing concrete channel, rough grading, HDPE storm drain, installation of a temporary detention basin, construction of a temporary diversion channel, water treatment facility, fencing, RCP, double RCB measuring 23-feet wide by 10-feet high, new concrete channel, concrete access road, gravel yard,…Read more

West Fontana Channel Project

This project for San Bernardino County Public Works included the construction of a three-mile-long reinforced concrete rectangular channel, with adjacent asphalt paving work, pre-cast reinforced concrete box culverts, piping, installation of chain link fencing and gates, relocation of street lights, electrical work, gas lines, and telephone lines.Read more

La Novia Roundabout Project

The La Novia Roundabout Project was designed to improve traffic flow by reconfiguring the existing stop-controlled intersection. The new system allows drivers to follow La Novia Avenue, or to take Valle Road going North or South.  Sukut performed construction services on this project, which included the removal of an existing offset intersection and replacing it with a…Read more

Hi-Desert Water District Barron Pump Station

The work included site clearing and grubbing, trenching, shoring, excavation, backfill, and compaction.  Additionally, the scope included the installation of the pump station and associated control equipment. A flow meter vault was constructed, as well as a diversion structure, manhole, underground piping, valves, instruments, and electrical.  Sukut also installed air conditioning, precast vaults, site security…Read more

CSA 70, Zone W4 – Pioneertown Pipeline Project

The scope of work consisted of the installation of 20,400 linear feet of DIP and 40,800 linear feet of fiber optic communication. The project also included two lift stations along with booster pumps, electrical power, control panels, communication electronics, pumps, and above and below-ground holding tanks.  Additionally, Sukut performed cold planning, asphalt paving, and placing…Read more

Clinton Keith Road Construction Phase 2

Sukut completed new road construction on Clinton Keith Road Construction. The project highlights included: 500,000 cubic yards of dirt and rock excavation 91,000 cubic yards of rock blasting 10,000 linear feet of RCP storm drain Two retaining walls One cast-in-place multi-span box girder bridge One precast double-arch wildlife bridge with MSE wallsRead more

Cajon Air Center Underground Detention Basin

This project entailed excavating down and installing a two-acre underground water storage reservoir capable of holding approximately 12 acre-feet of water. The project highlights included: Onsite contaminated groundwater required a water treatment system for dewatering operation Placed 3,600 cubic yards of concrete slab Placed 734 individual precast concrete structures 66,000 cubic yards of excavation Meeting…Read more

La Pata Avenue – Schedule C

This project entailed constructing a new half-a-mile-long road, connecting Camino Del Rio to Avenida la Pata in San Clemente. The project highlights included: Accelerated and completed three months ahead of schedule New roadway construction ½ mile connecting Avenida La Pata to Camino Del Rio Worked with the San Clemente community to minimize noise complaints. Zero…Read more

© 2024 Sukut Construction, LLC. All Rights Reserved.

Designed and managed by PushMyWeb

CALL NOW