La Pata Avenue Gap Closure Project – Schedule B

Sukut was performing construction services on the La Pata project that included a one-mile three-to-five-lane roadway widening from Stallion Ridge to Ortega Highway. The project was completed three months ahead of schedule, with value-engineered asphalt removal and installation.  Read more

Lakewood Stormwater Capture at Mayfair Park Project

The work included 35,000 cubic yards of export, excavation of 92,700 cubic yards, shoring beam and plate, installation of 914 underground storage units, removal and replacement of 2 new tennis courts, 12’ wide sidewalk, 8’ wide sidewalk, new building extension, stormwater harvesting system, including filters pumps, diversion structure, rubber dam, pneumatic date, active control, new…Read more

Hi-Desert Water District Wastewater Reclamation, Phase I, Package C

The project was adjacent next to another Hi-Desert Water District project, also executed by Sukut. The scope consisted of constructing over 32 miles of gravity sewer pipeline and 422 polymer manholes. The pipes ranged in size from 6” to 21”, and vary in depth from 6’ to 25’. Construction of the system included four jack…Read more

Clinton Keith Road Phase 4 Project

This road project will include roadway and rock excavation for widening areas of over 17,000 cubic yards, decomposed granite trail of more than 100,000 square feet, various minor concrete structures and nearly 17,000 tons of asphalt paving. Read more

Port of Los Angeles

Prime contractor Sukut Construction performed grading and demo operations in front of the ongoing erection of Reefer Racks – the red steel structures in the backdrop — inside an active Port of Los Angeles shipping terminal. The scope of work included the reconstruction of 21 acres of an active container terminal yard, ductile iron pipe…Read more

Riverside Drive

A long, deep vertical cut was needed to install a storm drain pipe near dairy farms. Rather than utilizing an excavator, Sukut used scrapers to excavate the ground. This created a large pipe excavation zone that greatly increased production. This also created a stockpile of dirt that could not fit in the construction easement on…Read more

Alton Parkway Extension

Sukut was the general contractor on this roadway and utility improvement project. The Alton project and the adjoining County of Orange project were set up to join the existing Alton Parkway Road from Irvine Blvd. in the City of Irvine, through the County of Orange, connecting at the 241 Toll Road in the city of…Read more

Eastern Corridor 241-261 – Toll Road

A design-built project consisting of 26 miles of new roadway including six lanes, with Sukut performing earthwork, drainage, and roadway construction, and FCI constructing bridges. Sukut moved 67 million cubic yards of earth through the rugged Santa Ana mountains, including 15 million cubic yards of rock. Earthwork excavation included cuts in excess of 300 ft…Read more