Projects > Completed

Alternative Energy

See more

Environmental Services

See more

Public Works

See more

Private Works

See more

Dams and Reservoirs

See more

Alternative Energy

Appaloosa Solar Project

Sukut performed the mechanical and module construction of a 200 MWac solar ...

Read More

Gaskell 2-5 Solar Civil and Mechanical Project

Sukut constructed a 100 MWac solar project in the Rosamond area. The civil ...

Read More

Santa Ana BESS Project

Sukut completed site preparation work, trenching, and paving for the civil ...

Read More

Tranquillity BESS Project

Rosendin Electric selected Sukut to perform the civil scope on the 72 MW ...

Read More

Aktina Solar Project

Rosendin Electric contracted Sukut to complete the mechanical scope at the ...

Read More

Copper Mountain 5 Solar Civil Project

The project consisted of over 1,100 acres of grading, 20 miles of ...

Read More

Dams and Reservoirs

Trampas Canyon Dam and Reservoir Project

The Santa Margarita Water District contracted with Sukut to complete the ...

Read More

Upper Chiquita Reservoir Slope Repair

Sukut performed repair services on the 1.5:1 slope that was damaged during ...

Read More

Calaveras Dam Replacement Project

Sukut and our valued joint venture partners, Dragados USA and Flatiron, ...

Read More

Lake Isabella Dam Safety Modification Project

The Lake Isabella Dam Safety Modification Project (DSMP) consisted of ...

Read More

San Vicente Dam

Sukut Construction worked as a subcontractor on the San Vicente Dam ...

Read More

San Pablo Dam Seismic Project

Sukut teamed with Raito, Inc. to upgrade San Pablo Dam by removing the ...

Read More

Upper Chiquita Reservoir

The Upper Chiquita Reservoir project required the excavation and placement ...

Read More

Environmental Services

Landers Sanitary Landfill Phase 1A Project

Sukut constructed the Phase 1A cell expansion of the Landers Landfill for ...

Read More

Altamont Landfill FA2 Phase 5 and Compost Facility Contact Water Pond 2 Project

Sukut performed landfill improvements by excavating roughly 600,000 cubic ...

Read More

Keller Canyon Cell Phase 2F Project

This seven-acre cell construction project involved the excavation of ...

Read More

North County Landfill Area 6 Recycling Center and Sanitary Landfill Project

The project included 250,000 cubic yards of excavation to stockpile and ...

Read More

Barstow Sanitary Landfill Liner 1B Project

This project included excavating 460,000 cubic yards of earth, installing ...

Read More

Guadalupe Recycling and Disposal Phase 3 Module IV Base Liner Project

The project included the excavation of 170,000 cubic yards to stockpile and ...

Read More

Vasco Road Landfill DU-13B Cell Construction 2022 Project

The project included excavation and stockpiling of 175,000 cubic yards of ...

Read More

Antelope Valley Public Landfill Cell Phase V-B Project

This project for Waste Management consisted of 1.5 million cubic yards of ...

Read More

El Sobrante Landfill Phase 13A Liner and Leachate Collection System Project

On this project, Sukut performed work that included excavation, fine grade, ...

Read More

Prima Deshecha Landfill Zone 4 Habitat Mitigation Project

Sukut performed drainage improvements at the Prima Deshecha Landfill which ...

Read More

Prima Deshecha Landfill Zone 1 Phase D2 Liner and Groundwater Project

Sukut worked on the expansion of the groundwater protection liner system at ...

Read More

Prima Deshecha Landfill Fee Booth Relocation and Entrance Improvements CMAR Project

Acting as a CMAR, Sukut made significant infrastructure upgrades to the ...

Read More

El Sobrante Landfill Phase 13A Project

This project included clearing, excavating 4,500,000 cubic yards of ...

Read More

Altamont Landfill FA2 Phase 4 Project

This project included the excavation of 1,300,000 million cubic yards of ...

Read More

Northern Branch for the 2020 Fire Debris and Tree Removal Project

Sukut entered into a joint venture with Pacific States Environmental ...

Read More

Tree Removal Services Project for the Camp Fire in Butte County

Acting as a Managing Partner, Sukut entered into a joint venture with Odin ...

Read More

Badlands Landfill C2P5 and C3P2 Liner Expansion Project

This project involved over 10,000 cubic yards of excavation and engineered ...

Read More

Prima Capistrano Greenery Project

This project involved moving over 100,000 cubic yards of dirt and providing ...

Read More

FRB Bee Canyon Greenery Project

This project consisted of 740,000 cubic yards of earthwork, construction of ...

Read More

El Sobrante Landfill Phase 12 Liner and LCRS and Phase C2 Partial Final Closure Project

This is a combination of two projects. The first project was a 10-acre ...

Read More

San Timoteo Sanitary Landfill Unit 2 Phases 3-2 and 4 Groundwater Protection System Composite Liner Construction project

The work on this project included excavation of up to two million cubic ...

Read More

Altamont Landfill FA2 Phases 2 and 2B Containment, and Phase 3 Expansion Project

The project included the excavation of 1.4 million cubic yards of soil ...

Read More

Chiquita Canyon Landfill C6 Liner Project

The project included the excavation of one million cubic yards of soil for ...

Read More

Butte Fire Debris Removal Project

The Butte Fire that started on September 9, burned 70,868 acres. In the ...

Read More

Sunshine Canyon Landfill CC-4P3 Liner Construction Project

This mass excavation project consisted of 700,000 cubic yards of material ...

Read More

Camp Fire Debris Removal Cleanup Project

Sukut entered into a joint venture with Goodfellow Bros. and Pacific States ...

Read More

El Sobrante LF Phase C 1 Partial Final Closure Project

This project for Waste Management consisted of approximately 1.5 million ...

Read More

Mid Valley Landfill Unit 4 Ph 1 Liner Construction

The project included the installation of 24-inch thick low permeability ...

Read More

Clear Lake Shoreline Cleanup

This project involved an emergency cleanup of wildfire debris that was ...

Read More

Olinda Alpha Landfill Phase 2

Sukut continued work at the active Olinda Alpha Landfill with the Phase 2 ...

Read More

Wildfire Post Debris Removal

Sukut has been contracted by the California Governor’s Office of Emergency ...

Read More

Santa Rosa/Napa Fire Debris Cleanup

Sukut Construction was awarded the Santa Rosa/Napa Fire Debris Cleanup ...

Read More

Thomas Fire Project

At the beginning of 2018, Sukut was contracted by CalRecycle to perform the ...

Read More

Detwiler Fire Debris Removal and Recovery

The project scope included the removal, storage, transportation, and ...

Read More

Prima Deshecha Landfill Zone 1 Phase D Mass Excavation and Liner Project

The project consisted of the construction of a composite liner system ...

Read More

Frank R. Bowerman Landfill

Located in Irvine, Sukut developed a new landfill cell including mass earth ...

Read More

Prima Deshecha – Landfill

This project supported the landfill expansion and placement of liners in ...

Read More

Tracy Tire Fire Site Remediation Services

After burning for two and one-half years, Sukut was called upon to ...

Read More

Private Works

Cielo Vista Rough Grading, Bridge, and Line D Storm Drain Improvements Project

Sukut performed the remedial grading and mass excavation of this 34-acre ...

Read More

Westlake Phase 2 Lake 2 Construction Project

As a general contractor on this project, Sukut oversaw the dewatering, ...

Read More

Rienda Zones A and 1 Tank Site and Pipelines Project

Sukut performed work that consisted of constructing the Rienda interim ...

Read More

San Marcos Highlands Grading Project

This residential rough grading project for KB Home involved earthmoving ...

Read More

The Highlands at Tesoro del Valle Project

This rough grading project is located on the 400-acre site and involved ...

Read More

Cow Camp Road Phase 2B and SMVD Improvements Project

The Cow Camp Road 2B Roadway & SMWD Improvements project in Rancho ...

Read More

RMV PA 3.1 and CCR Rough Grading Project

Project included mass excavation of 3,000,000 cubic yards and nearly ...

Read More

FedEx Ontario Airport Expansion Project

On this project, Sukut handled 450,000 cubic yards of over-excavation and ...

Read More

Hidden Canyon PA 18

Sukut moved over 3.2 million cubic yards of dirt and rock to create 258 ...

Read More

Rancho Mission Viejo The Ranch – PA 2.3 ,2.4 Los Patrones Grading and Storm Drain

Sukut installed 12,000 linear feet of storm drain ranging from 18” to 72”.  ...

Read More

Rolling Hills Country Club Grading and Storm Drain

This project involved the transforming of the existing golf course and ...

Read More

Porter Ranch Project

This hillside residential grading project was the last phase of the Porter ...

Read More

Hyundai-Kia Proving Ground

Sukut graded and paved a 6.5-mile oval test track for the Hyundai/Kia ...

Read More

Harmony Grove Project

This rough grading project for Standard Pacific included 3,000,000 cubic ...

Read More

Crystal Cove

Sukut won the ASCE Project of the Year Award after moving 30 million cubic ...

Read More

Pelican Hill Golf Course and Resort

In 1990, Sukut built the world-renowned Pelican Hill golf course. In 2005, ...

Read More

Headlands Reserve

Located on the beautiful beaches of Dana Point, Headlands Reserve is now ...

Read More

Walnut Hills – Three Oaks Project

Sukut moved more than 17 million cubic yards of dirt to create 268 mountain ...

Read More

Dos Lagos 18 Hole Golf Course

Sukut reclaimed the long-abandoned dumping ground site with an innovative ...

Read More

Public Works

San Pasqual Undergrounding Project

Sukut removed, relocated, and replaced approximately two and a half miles ...

Read More

Lower Elkhorn Interior Drainage Project

Sacramento Area Flood Control Agency contracted Sukut to construct a ...

Read More

CalTrans Highway 29 Project

Sukut completed this three-mile-long highway realignment project that ...

Read More

Cajon Air Center – Aircraft Transient Apron Project

This project of building a transient aircraft apron connecting to existing ...

Read More

Oasis In-Lieu Recharge Project

The project consisted of a 60 AF reservoir, 2835 linear feet of 72-inch ...

Read More

Cajon Air Center Drainage Project

On this project, Sukut installed approximately 3,000 feet of concrete pipe ...

Read More

Hi-Desert Water District Wastewater Reclamation, Phase I, Package D Project

The project included the installation of approximately 40 miles of gravity ...

Read More

Canyon Country Community Center Project

On this project, Sukut performed the following work: clear and grub, ...

Read More

West Fontana Channel Project

This project for San Bernardino County Public Works included the ...

Read More

La Novia Roundabout Project

The La Novia Roundabout Project was designed to improve traffic flow by ...

Read More

Hi-Desert Water District Barron Pump Station

The work included site clearing and grubbing, trenching, shoring, ...

Read More

CSA 70, Zone W4 – Pioneertown Pipeline Project

The scope of work consisted of the installation of 20,400 linear feet of ...

Read More

Clinton Keith Road Construction Phase 2

Sukut completed new road construction on Clinton Keith Road Construction. ...

Read More

Cajon Air Center Underground Detention Basin

This project entailed excavating down and installing a two-acre underground ...

Read More

La Pata Avenue – Schedule C

This project entailed constructing a new half-a-mile-long road, connecting ...

Read More

Industry Business Center West Side Grading Phase 2

This project entailed grading 250 acres, excavation of native unstable ...

Read More

La Pata Avenue Gap Closure Project – Schedule B

Sukut was performing construction services on the La Pata project that ...

Read More

Heacock Channel (Sunnymead MDP Line B) Stages 3 and 4

This flood control project consisted of dewatering, excavation, and the ...

Read More

Hi-Desert Water District Wastewater Reclamation, Phase I, Package C

The project was adjacent next to another Hi-Desert Water District project, ...

Read More

Clinton Keith Road Phase 4 Project

This road project will include roadway and rock excavation for widening ...

Read More

Port of Los Angeles

Prime contractor Sukut Construction performed grading and demo operations ...

Read More

Riverside Drive

A long, deep vertical cut was needed to install a storm drain pipe near ...

Read More

Eastern Corridor 241-261 – Toll Road

A design-built project consisting of 26 miles of new roadway including six ...

Read More

© 2024 Sukut Construction, LLC. All Rights Reserved.