Projects > Completed

Alternative Energy

See more

Environmental Services

See more

Public Works

See more

Private Works

See more

Dams and Reservoirs

See more

Alternative Energy

Santa Ana BESS Project

Sukut completed site preparation work, trenching, and paving for the civil ...

Read More

Townsite BESS Project

This project included grading for transformers and battery megapacks with ...

Read More

Mustang BESS Civil Project

Sukut performed civil, concrete, and trenching scope on this battery pack ...

Read More

Tranquillity BESS Project

Rosendin Electric selected Sukut to perform the civil scope on the 72 MW ...

Read More

Townsite Solar Civil, Piles, and Racking Project

Sukut constructed a 200 MW solar project, completing the civil, channel, ...

Read More

Todd Solar Project

Sukut installed the FTC racking system on a 25MW solar farm in Maryland ...

Read More

Aktina Solar Project

Rosendin Electric contracted Sukut to complete the mechanical scope at the ...

Read More

Eastline Solar Civil Mechanical (Piles and Racking) and Electrical Trenching Project

This project consisted of the construction of a 100 MWAC solar site and ...

Read More

TWC Westside Solar Civil and Pile Driving Project

This project was the last phase of the previous TWC Westside Solar ...

Read More

Copper Mountain 5 Solar Civil Project

The project consisted of over 1,100 acres of grading, 20 miles of ...

Read More

Rosamond Central Solar Civil and Trenching Project

Sukut cleared and graded a 195 MWac 1100-acre solar site, including the ...

Read More

Techren 3, 4, 5 Solar Civil and Mechanical Project

Techren site is a 115 MW photovoltaic solar farm located in Boulder City, ...

Read More

Desert Harvest 1 and 2 Access Roads Project

This project included the construction of 105,600 linear feet of 20 and ...

Read More

Rancho Seco Solar Civil and Trenching Site Work

This civil site work project was located on a 160 MW solar site and ...

Read More

Blythe 3 Solar Civil and Pile Driving Project

This project included the construction of a 1000-acre, 125 MWac solar site. ...

Read More

TWC Solar – New Columbia and Belridge Solar Civil and Mechanical project

Sukut was awarded a TWC Solar – New Columbia and Belridge Solar Civil and ...

Read More

CIW Solar Civil Project

On this project, Sukut performed clearing, grading, and access road work. ...

Read More

Los Coches Substation Modification

Sukut constructed Phase 1 of 3 for SDG&E to accommodate upgraded 138kV ...

Read More

Solar Oasis Project

Sukut completed work on this 20 MW AC solar array project that was built on ...

Read More

Calipatria and Centinela Solar Civil and Mechanical Projects

This project consisted of two separate 12 MW sites on which Sukut performed ...

Read More

Moapa Southern Paiute Solar, Phases 1 and 2 Project

Sukut provided grading and trenching services on the Moapa Southern Paiute ...

Read More

Garland Solar

Sukut completed the site preparation on this solar project in three phases ...

Read More

Westside Solar Civil, Trenching and Pile Driving Project

Sukut performed grading, trenching, road construction and post-installation ...

Read More

EMWD Solar Energy Site Prep PH3 Project

This project included site development at four of the district’s regional ...

Read More

Voyager Wind Trench Backfill Project

The scope of work consisted of screening and backfilling of a medium ...

Read More

Southampton Solar Civil

Sukut performed excavation, new roadway construction, and installation of a ...

Read More

Gloucester Solar Civil Project

This project involved the construction of a 20 MW 150-acre solar site in ...

Read More

East County Substation

Sukut Construction performed 1.1 million yards of mass grading to construct ...

Read More

Antelope Expansion 2 Solar Access Road Project

On this project, Sukut constructed approximately 2.2 million square feet of ...

Read More

Panoche Valley Solar Phase 2 Civil Project

The scope of work involves civil improvements to a 600 acre photovoltaic ...

Read More

Panoche Valley Solar MV/DC Projects

This project in Panoche, San Benito County, CA, involved excavation and ...

Read More

Wistaria Solar Civil and Trenching Project

The project included civil work for a 745-acre site, construction of ...

Read More

Summer and Winter Wheats Solar Civil Project

Sukut was awarded the Summer and Winter Wheats Solar Civil project, located ...

Read More

Mojave Solar Project

Sukut Construction completed the civil site preparation in 2012 for the ...

Read More

Genesis Solar Energy Project

Sukut constructed 80,000 cubic yards of soil cement lined slopes in a five ...

Read More

Dams and Reservoirs

Trampas Canyon Dam and Reservoir Project

The Santa Margarita Water District contracted with Sukut to complete the ...

Read More

Upper Chiquita Reservoir Slope Repair

Sukut performed repair services on the 1.5:1 slope that was damaged during ...

Read More

Calaveras Dam Replacement Project

Sukut and our valued joint venture partners, Dragados USA and Flatiron, ...

Read More

Lake Isabella Dam Safety Modification Project

The Lake Isabella Dam Safety Modification Project (DSMP) consisted of ...

Read More

San Vicente Dam

Sukut Construction worked as a subcontractor on the San Vicente Dam ...

Read More

San Pablo Dam Seismic Project

Sukut teamed with Raito, Inc. to upgrade San Pablo Dam by removing the ...

Read More

Upper Chiquita Reservoir

The Upper Chiquita Reservoir project required the excavation and placement ...

Read More

Environmental Services

Altamont Landfill FA2 Phase 5 and Compost Facility Contact Water Pond 2 Project

Sukut performed landfill improvements by excavating roughly 600,000 cubic ...

Read More

Keller Canyon Cell Phase 2F Project

This seven-acre cell construction project involved the excavation of ...

Read More

Barstow Sanitary Landfill Liner 1B Project

This project included excavating 460,000 cubic yards of earth, installing ...

Read More

Guadalupe Recycling and Disposal Phase 3 Module IV Base Liner Project

The project included the excavation of 170,000 cubic yards to stockpile and ...

Read More

Antelope Valley Public Landfill Cell Phase V-B Project

This project for Waste Management consisted of 1.5 million cubic yards of ...

Read More

El Sobrante Landfill Phase 13A Liner and Leachate Collection System Project

On this project, Sukut performed work that included excavation, fine grade, ...

Read More

Prima Deshecha Landfill Zone 4 Habitat Mitigation Project

Sukut performed drainage improvements at the Prima Deshecha Landfill which ...

Read More

Prima Deshecha Landfill Zone 1 Phase D2 Liner and Groundwater Project

Sukut worked on the expansion of the groundwater protection liner system at ...

Read More

Prima Deshecha Landfill Fee Booth Relocation and Entrance Improvements CMAR Project

Acting as a CMAR, Sukut made significant infrastructure upgrades to the ...

Read More

Ox Mountain Landfill XXII Construction Project

This project involved the excavation of 150,000 cubic yards of hard rock to ...

Read More

Peter Pitchess Detention Center Class III Landfill Closure Project

This project involved placing over 100,000 cubic yards of earth cover ...

Read More

El Sobrante Landfill Phase 13A Project

This project included clearing, excavating 4,500,000 cubic yards of ...

Read More

Cell 3B Development Project

This project involved the excavation of approximately 400,000 cubic yards ...

Read More

Altamont Landfill FA2 Phase 4 Project

This project included the excavation of 1,300,000 million cubic yards of ...

Read More

FRB Landfill East Flank Northern Diverted Channel Project

This project involved mass grading and concrete construction work to build ...

Read More

FRB Phase VIIIB Fire Repair Project

This project included the removal and replacement of damaged geosynthetic ...

Read More

Northern Branch for the 2020 Fire Debris and Tree Removal Project

Sukut entered into a joint venture with Pacific States Environmental ...

Read More

Tree Removal Services Project for the Camp Fire in Butte County

Acting as a Managing Partner, Sukut entered into a joint venture with Odin ...

Read More

Badlands Landfill C2P5 and C3P2 Liner Expansion Project

This project involved over 10,000 cubic yards of excavation and engineered ...

Read More

Altamont Landfill – FA 2 Phase 3 Cell Construction & Stormwater Improvements

This phase of the Altamont project included the excavation of 2.6 million ...

Read More

Riverside County Landfills Daily Cover Excavation and On-Call Improvements Project

This project consisted of 200,000 cubic yards of daily cover excavation and ...

Read More

Visalia Landfill Phase 4 Expansion Project

This project included the mass excavation of 355,000 cubic yards of ...

Read More

Sunshine Canyon Landfill CC-4 Part 4A Mass Excavation and Liner Project

This project included the construction of a 4.5-acre cell, which consisted ...

Read More

Landfill, Disposal Site and Waste Tire Site Remediation Project

Sukut has been awarded a three-year contract by Cal Recycle for Landfill, ...

Read More

Ox Mountain Landfill Phase XXI Liner Project

This project involved the excavation of 100,000 cubic yards of hard rock to ...

Read More

Keller Canyon Landfill Phase 3C Liner System Project

This six-acre cell construction project included 30,000 cubic yards of ...

Read More

Prima Capistrano Greenery Project

This project involved moving over 100,000 cubic yards of dirt and providing ...

Read More

FRB Bee Canyon Greenery Project

This project consisted of 740,000 cubic yards of earthwork, construction of ...

Read More

FRB Landfill Wetlands Basin Repair Project

Sukut remediated the damage caused by a breach in a wetlands basin berm. ...

Read More

Sunshine Canyon Office Relocation Project

This project’s intent was to relocate existing offices to a new location. ...

Read More

El Sobrante Landfill Phase 12 Liner and LCRS and Phase C2 Partial Final Closure Project

This is a combination of two projects. The first project was a 10-acre ...

Read More

California Street Landfill Phase 4 Expansion Project

On this project, Sukut constructed a new landfill cell, including mass ...

Read More

San Timoteo Sanitary Landfill Unit 2 Phases 3-2 and 4 Groundwater Protection System Composite Liner Construction project

The work on this project included excavation of up to two million cubic ...

Read More

Calabasas Landfill Project

Sukut worked on this emergency liner repair project in Agoura, CA. The ...

Read More

Sycamore Landfill Project

The landfill expansion project included 100,000 cubic yards of excavation ...

Read More

Sonoma Landfill CC-3 Construction Project

This landfill expansion project consisted of 20,000 cubic yards of ...

Read More

Altamont Landfill FA2 Phases 2 and 2B Containment, and Phase 3 Expansion Project

The project included the excavation of 1.4 million cubic yards of soil ...

Read More

Chiquita Canyon Landfill C6 Liner Project

The project included the excavation of one million cubic yards of soil for ...

Read More

Sunshine Canyon DWP Waterline Project

The project consisted of replacing the landfill’s existing HDPE ...

Read More

Butte Fire Debris Removal Project

The Butte Fire that started on September 9, burned 70,868 acres. In the ...

Read More

Sunshine Canyon Landfill CC-4P3 Liner Construction Project

This mass excavation project consisted of 700,000 cubic yards of material ...

Read More

Camp Fire Debris Removal Cleanup Project

Sukut entered into a joint venture with Goodfellow Bros. and Pacific States ...

Read More

El Sobrante LF Phase C 1 Partial Final Closure Project

This project for Waste Management consisted of approximately 1.5 million ...

Read More

Mid Valley Landfill Unit 4 Ph 1 Liner Construction

The project included the installation of 24-inch thick low permeability ...

Read More

Clear Lake Shoreline Cleanup

This project involved an emergency cleanup of wildfire debris that was ...

Read More

Frank R. Bowerman Landfill Crews Quarters and Storage Facility

The project consisted of the design, permitting and construction of modular ...

Read More

FRB Groundwater Protection System

Sukut performed work on the Groundwater Protection System project, ...

Read More

Olinda Alpha Landfill Phase 2

Sukut continued work at the active Olinda Alpha Landfill with the Phase 2 ...

Read More

Altamont Landfill – Compost Facility Grading and Drainage

Sukut Construction worked closely with subcontractors to move in excess of ...

Read More

Wildfire Post Debris Removal

Sukut has been contracted by the California Governor’s Office of Emergency ...

Read More

Fink Road Landfill – 2 Cell 6 Composite Liner Project

This project for Stanislaus County consisted of a 17 AC expansion which ...

Read More

Savage Canyon Landfill Liner Project

The scope of work included 430,000 cubic yards of mass excavation and ...

Read More

Sunshine Canyon Landfill Buttress

Work consisted of four million cubic yards of excavated material along with ...

Read More

Sunshine Canyon LF Cell CC-4 P2 Liner Project

Sukut completed a 5.8-acre cell construction, consisting of a five-layer ...

Read More

The Sunshine Canyon Landfill Vegetative Cover

The Sunshine Canyon Landfill Vegetative Cover project consisted of placing ...

Read More

Santa Rosa/Napa Fire Debris Cleanup

Sukut Construction was awarded the Santa Rosa/Napa Fire Debris Cleanup ...

Read More

Salton City Landfill Phase 1B Cell Construction

Sukut Construction was awarded the Salton City Landfill Phase 1B Cell ...

Read More

Thomas Fire Project

At the beginning of 2018, Sukut was contracted by CalRecycle to perform the ...

Read More

Detwiler Fire Debris Removal and Recovery

The project scope included the removal, storage, transportation, and ...

Read More

Prima Deshecha Landfill Zone 1 Phase D Mass Excavation and Liner Project

The project consisted of the construction of a composite liner system ...

Read More

Lancaster Landfill Liner Phase 1b and 1c

Liner expansion construction included mass excavation, engineered fill, ...

Read More

FRB Landfill Main Haul Road Crossing Repair

Sukut completed the emergency repair of the storm drain inlet and road ...

Read More

Mid-Valley Landfill and Liner Expansion

Mid Valley landfill is an active municipal landfill that opened Unit Three ...

Read More

Newberry and Yermo Sanitary Landfills

Sukut Construction excavated and stockpiled 60,000 cubic yards of soil. We ...

Read More

Palmdale Water Reclamation Plant

Palmdale Water Reclamation Plant Stage Five Effluent Management Facilities ...

Read More

San Bernardino County Fire Response – Grass Valley

This project consisted of a massive debris removal operation for 284 homes ...

Read More

Lancaster Water Treatment Plant

Sukut constructed four, 70-acre wastewater treatment ponds. This project ...

Read More

Frank R. Bowerman Landfill

Located in Irvine, Sukut developed a new landfill cell including mass earth ...

Read More

Steel Mill Slag Pile

Sukut Construction excavated the existing slag pile to a designed subgrade. ...

Read More

Prima Deshecha – Landfill

This project supported the landfill expansion and placement of liners in ...

Read More

Guadalupe Landfill

Guadalupe Landfill is an active landfill utilizing an active landfill gas ...

Read More

Jamestown Landfill Closure

Jamestown landfill is an inactive landfill that was originally closed in ...

Read More

Calabasas Landfill

This 35-acre project included mass excavation, installation of an ...

Read More

San Timoteo Sanitary Landfill

Sukut Construction has provided the San Bernardino County with landfill ...

Read More

Rancho Bernardo – FR

This project consisted of a massive debris removal operation for homes that ...

Read More

Tracy Tire Fire Site Remediation Services

After burning for two and one-half years, Sukut was called upon to ...

Read More

Puente Hills Landfill Slope Stabilization and Roads

Sukut Construction has been involved for many years with the Puente Hills ...

Read More

Lake Tahoe Fire Response

Sukut was part of a CIWMB response team that completed the Angora Debris ...

Read More

West Miramar Landfill

Sukut Construction was contracted by the City of San Diego to perform final ...

Read More

Private Works

La Mesa Summit Rough Grading Project

On this project, Sukut performed earthwork and drainage work to prepare ten ...

Read More

The Terraces at Walnut Project

Sukut performed the rough grading, including the excavation of 2.2 million ...

Read More

Westlake Phase 2 Lake 2 Construction Project

As a general contractor on this project, Sukut oversaw the dewatering, ...

Read More

Rienda Zones A and 1 Tank Site and Pipelines Project

Sukut performed work that consisted of constructing the Rienda interim ...

Read More

Monte Verde Project

Sukut’s scope of work on this Northern California fast-paced project ...

Read More

San Marcos Highlands Grading Project

This residential rough grading project for KB Home involved earthmoving ...

Read More

The Highlands at Tesoro del Valle Project

This rough grading project is located on the 400-acre site and involved ...

Read More

RMV Rienda Storm Drain Project

This project involved the installation of a large RCP storm drain up to, ...

Read More

Cow Camp Road Phase 2B and SMVD Improvements Project

The Cow Camp Road 2B Roadway & SMWD Improvements project in Rancho ...

Read More

FedEx Ontario Airport Taxiway A Project

Sukut was awarded the FedEx Ontario Airport Taxiway A project in Ontario, ...

Read More

RMV PA 3.1 and CCR Rough Grading Project

Project included mass excavation of 3,000,000 cubic yards and nearly ...

Read More

Los Patrones Parkway Improvements Phase 2 Project

The project included the restoration of median and shoulder grading for ...

Read More

FedEx Ontario Airport Expansion Project

On this project, Sukut handled 450,000 cubic yards of over-excavation and ...

Read More

Orchard Hills, Rough Grading And Storm Drain

Sukut moved over three million cubic yards of dirt and rock to create 223 ...

Read More

Hidden Canyon PA 18

Sukut moved over 3.2 million cubic yards of dirt and rock to create 258 ...

Read More

Thompson Ranch

This 3.8-million cubic yard residential grading project was a great success ...

Read More

Moorpark William Lyon Homes, Tract #5187

This residential grading project was located on a 350-acre land west of ...

Read More

St. John’s Seminary Rough Grading Project

This Southern California residential development project involved over two ...

Read More

Spencer’s Crossing – Tracts 37053-2 and 37053

This rough grading project was located in Murrieta within the County of ...

Read More

Hollywood Hills

Project included construction and operation of 4,300 linear feet of ...

Read More

Rancho Mission Viejo The Ranch – PA 2.3 ,2.4 Los Patrones Grading and Storm Drain

Sukut installed 12,000 linear feet of storm drain ranging from 18” to 72”.  ...

Read More

Rolling Hills Country Club Grading and Storm Drain

This project involved the transforming of the existing golf course and ...

Read More

Porter Ranch Project

This hillside residential grading project was the last phase of the Porter ...

Read More

Los Olivos Basin

Los Olivos Basin project involves the construction of multiple improvements ...

Read More

Serrano Summit Rough Grading Project

Sukut Construction was awarded the Serrano Summit Rough Grading project, ...

Read More

Hyundai-Kia Proving Ground

Sukut graded and paved a 6.5-mile oval test track for the Hyundai/Kia ...

Read More

Harmony Grove Project

This rough grading project for Standard Pacific included 3,000,000 cubic ...

Read More

Lake Forest Drive – Phase 2

The project consisted of 26 acres of grading work that included rough ...

Read More

Crystal Cove

Sukut won the ASCE Project of the Year Award after moving 30 million cubic ...

Read More

Pelican Hill Golf Course and Resort

In 1990, Sukut built the world-renowned Pelican Hill golf course. In 2005, ...

Read More

Spectrum 5 at Serrano Creek

Sukut is known to complete a difficult project on time and in very adverse ...

Read More

Marshburn Storm Drain and South Channel Improvements

The land where the storm drain project was located was being leased by a ...

Read More

Headlands Reserve

Located on the beautiful beaches of Dana Point, Headlands Reserve is now ...

Read More

Otay Quarry

This quarry is located adjacent to the Sleep Train Amphitheater in Chula ...

Read More

Summit Crest

Sukut graded the six acre hillside project at Pittsford and Osterman in ...

Read More

Audie Murphy Ranch

The development of 650 acres into 800 housing lots included 10 million ...

Read More

Portola Springs

This project was to rough grade a housing tract under a tight deadline. ...

Read More

Walnut Hills – Three Oaks Project

Sukut moved more than 17 million cubic yards of dirt to create 268 mountain ...

Read More

Kohl Ranch

A marshy track of property needed grading to create usable land for a ...

Read More

Dos Lagos 18 Hole Golf Course

Sukut reclaimed the long-abandoned dumping ground site with an innovative ...

Read More

Stone Crest

This project consisted of the grading of 98 acres of land and the ...

Read More

Public Works

Oceanside Municipal Airport Infield Grading /Apron Reconstruction Project

Sukut performed site work and paving for a transportation facility, Bob ...

Read More

San Pasqual Undergrounding Project

Sukut removed, relocated, and replaced approximately two and a half miles ...

Read More

TVRWRF Stormwater Assessment and Improvement Project

This project involved construction activities to harden an interim earthen ...

Read More

Lower Elkhorn Interior Drainage Project

Sacramento Area Flood Control Agency contracted Sukut to construct a ...

Read More

CalTrans Highway 29 Project

Sukut completed this three-mile-long highway realignment project that ...

Read More

Bautista Creek Channel Recharge Basin Project

This project involved the construction of a groundwater recharge basin for ...

Read More

Palm Canyon Wash, Stage 93 Emergency Levee Restoration Project

This emergency work contract consisted of the repair and restoration of ...

Read More

Cajon Air Center – Aircraft Transient Apron Project

This project of building a transient aircraft apron connecting to existing ...

Read More

Oasis In-Lieu Recharge Project

The project consisted of a 60 AF reservoir, 2835 linear feet of 72-inch ...

Read More

Cajon Air Center Drainage Project

On this project, Sukut installed approximately 3,000 feet of concrete pipe ...

Read More

New Model Colony Archibald and Edison Infrastructure Improvements

Sukut worked as a general contractor on the roadway and utility improvement ...

Read More

Hi-Desert Water District Wastewater Reclamation, Phase I, Package D Project

The project included the installation of approximately 40 miles of gravity ...

Read More

Canyon Country Community Center Project

On this project, Sukut performed the following work: clear and grub, ...

Read More

West Fontana Channel Project

This project for San Bernardino County Public Works included the ...

Read More

Hi-Desert Water District Barron Pump Station

The work included site clearing and grubbing, trenching, shoring, ...

Read More

CSA 70, Zone W4 – Pioneertown Pipeline Project

The scope of work consisted of the installation of 20,400 linear feet of ...

Read More

Technology Drive Street Improvements

This project involved Technology Drive Street improvements near Laguna ...

Read More

RMV Multi-Purpose Path

Sukut created a multi-purpose pathway for the residents of Rancho Mission ...

Read More

Clinton Keith Road Construction Phase 2

Sukut completed new road construction on Clinton Keith Road Construction. ...

Read More

Veterans Sports Park at Tustin Legacy

The Site was previously operated as a community park by the Department of ...

Read More

Cajon Air Center Underground Detention Basin

This project entailed excavating down and installing a two-acre underground ...

Read More

Haven Avenue SD & Sewer

Sukut Construction successfully completed installation of underground ...

Read More

La Pata Avenue – Schedule C

This project entailed constructing a new half-a-mile-long road, connecting ...

Read More

Industry Business Center West Side Grading Phase 2

This project entailed grading 250 acres, excavation of native unstable ...

Read More

La Pata Avenue Gap Closure Project – Schedule B

Sukut was performing construction services on the La Pata project that ...

Read More

Heacock Channel (Sunnymead MDP Line B) Stages 3 and 4

This flood control project consisted of dewatering, excavation, and the ...

Read More

Moffett and Legacy Roadway Extension Project

The project involved grading, and installation of approximately 3,000 ...

Read More

Orange County Great Park Western Sector Roadway Project

The project included the removal of existing utilities and roadway in order ...

Read More

Hi-Desert Water District Wastewater Reclamation, Phase I, Package C

The project was adjacent next to another Hi-Desert Water District project, ...

Read More

Clinton Keith Road Phase 4 Project

This road project will include roadway and rock excavation for widening ...

Read More

Peters Canyon Channel Widening

Sukut conducted the final export operation required to complete the ...

Read More

Port of Los Angeles

Prime contractor Sukut Construction performed grading and demo operations ...

Read More

Central Avenue Realignment

Sukut performed the realignment of Central Avenue including constructing a ...

Read More

Riverside Drive

A long, deep vertical cut was needed to install a storm drain pipe near ...

Read More

Route 905 – 6 Lane Fwy San Diego

Sukut Construction joined forces with Flatiron West, Inc. in a Joint ...

Read More

Oxnard Airport

Sukut eliminated two aviation hazards caused by large open channels near ...

Read More

Tustin Armstrong

Sukut poured concrete for the 900-linear -foot reinforced concrete box ...

Read More

Channel Islands Campus

This was a turn key infrastructure project including two bridges, sewer and ...

Read More

Robert B. Diemer Water Treatment Plant North Access Road

Sukut constructed a one-mile hillside access road for the Metropolitan ...

Read More

Cathedral City – Cove Infrastructure

Sukut upgraded outdated water, sewer, and storm drainage systems, eliminate ...

Read More

Hillcrest High School

This new 50-acre campus for the new Hillcrest High School was recognized by ...

Read More

State Route 76 Widening & Realignment

Subcontractor to Granite Construction, Sukut excavated 325,000 cubic yards ...

Read More

Monument 250 Border Fence

This project entails the construction of six miles of border access road ...

Read More

Eastern Corridor 241-261 – Toll Road

A design-built project consisting of 26 miles of new roadway including six ...

Read More

Santa Ana River Trail

Sukut moved 35,000 cubic yards of dirt to accomplish this three and a half ...

Read More

Pepperdine University Graduate Campus

This project involved the movement of 3,000,000 cubic yards of earth in ...

Read More

© 2023 Sukut Construction, LLC. All Rights Reserved.

Designed and managed by PushMyWeb

CALL NOW