Projects > Completed
Alternative Energy
See moreEnvironmental Services
See morePublic Works
See morePrivate Works
See moreDams and Reservoirs
See moreDams and Reservoirs
![](https://sukut.com/wp-content/uploads/2018/04/Trampas-3-670x400.jpg)
Trampas Canyon Dam and Reservoir Project
The Santa Margarita Water District contracted with Sukut to complete the ...
Read More![](https://sukut.com/wp-content/uploads/2018/03/Upper-Chiquita-Reservoir-Slope-Repair-670x400.jpg)
Upper Chiquita Reservoir Slope Repair
Sukut performed repair services on the 1.5:1 slope that was damaged during ...
Read More![](https://sukut.com/wp-content/uploads/2018/03/calaveras-2-670x400.jpg)
Calaveras Dam Replacement Project
Sukut and our valued joint venture partners, Dragados USA and Flatiron, ...
Read More![](https://sukut.com/wp-content/uploads/2018/03/Unknown-2-670x400.jpeg)
Lake Isabella Dam Safety Modification Project
The Lake Isabella Dam Safety Modification Project (DSMP) consisted of ...
Read More![](https://sukut.com/wp-content/uploads/2014/09/San-Vicente-Dam-670x400.jpg)
![](https://sukut.com/wp-content/uploads/2010/09/San-Pablo-Dam-Reservoir-670x400.jpg)
San Pablo Dam Seismic Project
Sukut teamed with Raito, Inc. to upgrade San Pablo Dam by removing the ...
Read More![](https://sukut.com/wp-content/uploads/2010/01/Upper-Chiquita-Reservoir-670x400.jpg)
Upper Chiquita Reservoir
The Upper Chiquita Reservoir project required the excavation and placement ...
Read MoreEnvironmental Services
![](https://sukut.com/wp-content/uploads/2022/12/LLF-0220-670x400.jpg)
Landers Sanitary Landfill Phase 1A Project
Sukut constructed the Phase 1A cell expansion of the Landers Landfill for ...
Read More![](https://sukut.com/wp-content/uploads/2022/06/altamont-FA2-Ph-5-and-pond-670x400.jpg)
Altamont Landfill FA2 Phase 5 and Compost Facility Contact Water Pond 2 Project
Sukut performed landfill improvements by excavating roughly 600,000 cubic ...
Read More![](https://sukut.com/wp-content/uploads/2022/05/Keller-Canyon-Cell-Phase-2F-Project-670x400.jpg)
Keller Canyon Cell Phase 2F Project
This seven-acre cell construction project involved the excavation of ...
Read More![](https://sukut.com/wp-content/uploads/2022/05/North-County-Landfill-Area-6-Recycling-Center-and-Sanitary-Landfill-Project-670x400.jpg)
North County Landfill Area 6 Recycling Center and Sanitary Landfill Project
The project included 250,000 cubic yards of excavation to stockpile and ...
Read More![](https://sukut.com/wp-content/uploads/2022/04/Barstow-Sanitary-Landfil-Liner-1B-Project-670x400.jpg)
Barstow Sanitary Landfill Liner 1B Project
This project included excavating 460,000 cubic yards of earth, installing ...
Read More![](https://sukut.com/wp-content/uploads/2022/04/Guadalupe-Recycling-and-Disposal-Phase-3-Module-IV-Base-Liner-Project-670x400.jpg)
Guadalupe Recycling and Disposal Phase 3 Module IV Base Liner Project
The project included the excavation of 170,000 cubic yards to stockpile and ...
Read More![](https://sukut.com/wp-content/uploads/2022/03/Vasco-Road-Landfill-DU-13B-Cell-Construction-2022-Project-670x400.jpg)
Vasco Road Landfill DU-13B Cell Construction 2022 Project
The project included excavation and stockpiling of 175,000 cubic yards of ...
Read More![](https://sukut.com/wp-content/uploads/2021/11/Antelope-Valley-Public-landfill-Cell-Phase-V-B-670x400.jpg)
Antelope Valley Public Landfill Cell Phase V-B Project
This project for Waste Management consisted of 1.5 million cubic yards of ...
Read More![](https://sukut.com/wp-content/uploads/2021/11/El-Sobrante-landfill-Phase-13A-Liner-Leachate-collection-system-670x400.jpg)
El Sobrante Landfill Phase 13A Liner and Leachate Collection System Project
On this project, Sukut performed work that included excavation, fine grade, ...
Read More![](https://sukut.com/wp-content/uploads/2021/09/Prima-Deshecha-LF-Zone-4-Habitat-Mitigation-project-670x400.jpg)
Prima Deshecha Landfill Zone 4 Habitat Mitigation Project
Sukut performed drainage improvements at the Prima Deshecha Landfill which ...
Read More![](https://sukut.com/wp-content/uploads/2021/09/Prima-Deshecha-LF-Zone-1-Phase-D2-Liner-Groundwater-project-670x400.jpg)
Prima Deshecha Landfill Zone 1 Phase D2 Liner and Groundwater Project
Sukut worked on the expansion of the groundwater protection liner system at ...
Read More![](https://sukut.com/wp-content/uploads/2021/09/IMG_4196-670x400.jpg)
Prima Deshecha Landfill Fee Booth Relocation and Entrance Improvements CMAR Project
Acting as a CMAR, Sukut made significant infrastructure upgrades to the ...
Read More![](https://sukut.com/wp-content/uploads/2021/07/ESLF-0607-670x400.jpg)
El Sobrante Landfill Phase 13A Project
This project included clearing, excavating 4,500,000 cubic yards of ...
Read More![](https://sukut.com/wp-content/uploads/2021/03/ALF-0029-670x400.jpg)
Altamont Landfill FA2 Phase 4 Project
This project included the excavation of 1,300,000 million cubic yards of ...
Read More![](https://sukut.com/wp-content/uploads/2020/12/CWFC-0634-670x400.jpg)
Northern Branch for the 2020 Fire Debris and Tree Removal Project
Sukut entered into a joint venture with Pacific States Environmental ...
Read More![](https://sukut.com/wp-content/uploads/2020/11/Camp-Fire-Tree-Removal-project-670x400.jpg)
Tree Removal Services Project for the Camp Fire in Butte County
Acting as a Managing Partner, Sukut entered into a joint venture with Odin ...
Read More![](https://sukut.com/wp-content/uploads/2020/10/Badlands-Landfill-C2P5-and-C3P2-Liner-Expansion-Project-670x400.jpg)
Badlands Landfill C2P5 and C3P2 Liner Expansion Project
This project involved over 10,000 cubic yards of excavation and engineered ...
Read More![](https://sukut.com/wp-content/uploads/2020/03/Prima-Capistrano-Greenery-Project-670x400.jpg)
Prima Capistrano Greenery Project
This project involved moving over 100,000 cubic yards of dirt and providing ...
Read More![](https://sukut.com/wp-content/uploads/2020/01/FRBBC-0259-670x400.jpg)
FRB Bee Canyon Greenery Project
This project consisted of 740,000 cubic yards of earthwork, construction of ...
Read More![](https://sukut.com/wp-content/uploads/2019/09/El-Sobrante-Landfill-Phase-12-Liner-LCRS-and-Phase-C2-Partial-Final-Closure-project-670x400.jpg)
El Sobrante Landfill Phase 12 Liner and LCRS and Phase C2 Partial Final Closure Project
This is a combination of two projects. The first project was a 10-acre ...
Read More![](https://sukut.com/wp-content/uploads/2019/08/STLF-0669-670x400.jpg)
San Timoteo Sanitary Landfill Unit 2 Phases 3-2 and 4 Groundwater Protection System Composite Liner Construction project
The work on this project included excavation of up to two million cubic ...
Read More![](https://sukut.com/wp-content/uploads/2019/04/altamont-1-670x400.jpg)
Altamont Landfill FA2 Phases 2 and 2B Containment, and Phase 3 Expansion Project
The project included the excavation of 1.4 million cubic yards of soil ...
Read More![](https://sukut.com/wp-content/uploads/2019/04/Chiquita-Canyon-Landfill-C6-Liner-670x400.jpg)
Chiquita Canyon Landfill C6 Liner Project
The project included the excavation of one million cubic yards of soil for ...
Read More![](https://sukut.com/wp-content/uploads/2019/03/Court-House-2-670x400.jpg)
Butte Fire Debris Removal Project
The Butte Fire that started on September 9, burned 70,868 acres. In the ...
Read More![](https://sukut.com/wp-content/uploads/2019/03/IMG_7091-670x400.jpg)
Sunshine Canyon Landfill CC-4P3 Liner Construction Project
This mass excavation project consisted of 700,000 cubic yards of material ...
Read More![](https://sukut.com/wp-content/uploads/2019/02/Camp-Fire-Debris-Removal-Cleanup-NEW-670x400.jpg)
Camp Fire Debris Removal Cleanup Project
Sukut entered into a joint venture with Goodfellow Bros. and Pacific States ...
Read More![](https://sukut.com/wp-content/uploads/2018/11/El-Sobrante-Landfill-–-Phase-C-PFC-670x400.jpg)
El Sobrante LF Phase C 1 Partial Final Closure Project
This project for Waste Management consisted of approximately 1.5 million ...
Read More![](https://sukut.com/wp-content/uploads/2018/09/MVLF190912-0086-670x400.jpg)
Mid Valley Landfill Unit 4 Ph 1 Liner Construction
The project included the installation of 24-inch thick low permeability ...
Read More![](https://sukut.com/wp-content/uploads/2018/08/1253-Clearlake-Shoreline-2-670x400.jpg)
Clear Lake Shoreline Cleanup
This project involved an emergency cleanup of wildfire debris that was ...
Read More![](https://sukut.com/wp-content/uploads/2018/07/1221-3-670x400.jpg)
Olinda Alpha Landfill Phase 2
Sukut continued work at the active Olinda Alpha Landfill with the Phase 2 ...
Read More![](https://sukut.com/wp-content/uploads/2018/07/1277-3-670x400.jpg)
Wildfire Post Debris Removal
Sukut has been contracted by the California Governor’s Office of Emergency ...
Read More![](https://sukut.com/wp-content/uploads/2018/03/Santa-Rosa-and-Napa-Fire-Debris-Cleanup-Project-670x400.jpg)
Santa Rosa/Napa Fire Debris Cleanup
Sukut Construction was awarded the Santa Rosa/Napa Fire Debris Cleanup ...
Read More![](https://sukut.com/wp-content/uploads/2018/03/Thomas-fire-1-e1522777759356-670x400.jpg)
Thomas Fire Project
At the beginning of 2018, Sukut was contracted by CalRecycle to perform the ...
Read More![](https://sukut.com/wp-content/uploads/2018/03/Detwiller-1241-670x400.jpg)
Detwiler Fire Debris Removal and Recovery
The project scope included the removal, storage, transportation, and ...
Read More![](https://sukut.com/wp-content/uploads/2018/03/Prima-Deshecha-Landfill-Zone-1-Phase-D-Mass-Excavation-and-Liner-Project-670x400.jpg)
Prima Deshecha Landfill Zone 1 Phase D Mass Excavation and Liner Project
The project consisted of the construction of a composite liner system ...
Read More![](https://sukut.com/wp-content/uploads/2013/11/Frank-Bowerman-Landfill-1-of-1-670x400.jpg)
Frank R. Bowerman Landfill
Located in Irvine, Sukut developed a new landfill cell including mass earth ...
Read More![](https://sukut.com/wp-content/uploads/2013/02/Prima-Descheca-Landfill-1-of-1-5-670x400.jpg)
Prima Deshecha – Landfill
This project supported the landfill expansion and placement of liners in ...
Read More![](https://sukut.com/wp-content/uploads/2008/03/Tracy-Tire-Fire.3-Rainbow4_12X9-670x400.jpg)
Tracy Tire Fire Site Remediation Services
After burning for two and one-half years, Sukut was called upon to ...
Read MorePrivate Works
![](https://sukut.com/wp-content/uploads/2022/03/4-670x400.jpg)
Cielo Vista Rough Grading, Bridge, and Line D Storm Drain Improvements Project
Sukut performed the remedial grading and mass excavation of this 34-acre ...
Read More![](https://sukut.com/wp-content/uploads/2021/08/03012022_A3A3576-670x400.jpg)
Westlake Phase 2 Lake 2 Construction Project
As a general contractor on this project, Sukut oversaw the dewatering, ...
Read More![](https://sukut.com/wp-content/uploads/2021/06/Rienda-Zones-A-and-1-Tank-Site-and-Pipelines-Project-670x400.jpg)
Rienda Zones A and 1 Tank Site and Pipelines Project
Sukut performed work that consisted of constructing the Rienda interim ...
Read More![](https://sukut.com/wp-content/uploads/2021/04/San-Marcos-Highlands-Grading-Project-website-670x400.jpg)
San Marcos Highlands Grading Project
This residential rough grading project for KB Home involved earthmoving ...
Read More![](https://sukut.com/wp-content/uploads/2021/03/TDV-0433-670x400.jpg)
The Highlands at Tesoro del Valle Project
This rough grading project is located on the 400-acre site and involved ...
Read More![](https://sukut.com/wp-content/uploads/2020/04/RMV200309-28295-670x400.jpg)
Cow Camp Road Phase 2B and SMVD Improvements Project
The Cow Camp Road 2B Roadway & SMWD Improvements project in Rancho ...
Read More![](https://sukut.com/wp-content/uploads/2019/11/RMV-0258-670x400.jpg)
RMV PA 3.1 and CCR Rough Grading Project
Project included mass excavation of 3,000,000 cubic yards and nearly ...
Read More![](https://sukut.com/wp-content/uploads/2019/04/fedex1-670x400.jpg)
FedEx Ontario Airport Expansion Project
On this project, Sukut handled 450,000 cubic yards of over-excavation and ...
Read More![](https://sukut.com/wp-content/uploads/2019/03/1130-Hidden-Canyon-670x400.jpg)
Hidden Canyon PA 18
Sukut moved over 3.2 million cubic yards of dirt and rock to create 258 ...
Read More![](https://sukut.com/wp-content/uploads/2018/08/1190-RMV-The-Ranch-PA-2.3-and-2.4-670x400.jpg)
Rancho Mission Viejo The Ranch – PA 2.3 ,2.4 Los Patrones Grading and Storm Drain
Sukut installed 12,000 linear feet of storm drain ranging from 18” to 72”. ...
Read More![](https://sukut.com/wp-content/uploads/2018/07/Rolling-Hills-Grading-1183-2-670x400.jpg)
Rolling Hills Country Club Grading and Storm Drain
This project involved the transforming of the existing golf course and ...
Read More![](https://sukut.com/wp-content/uploads/2018/07/000-NY-Times-Shot-670x400.jpg)
Porter Ranch Project
This hillside residential grading project was the last phase of the Porter ...
Read More![](https://sukut.com/wp-content/uploads/2014/12/Hyundai-Kia-Test-Track-119_12x9-670x400.jpg)
Hyundai-Kia Proving Ground
Sukut graded and paved a 6.5-mile oval test track for the Hyundai/Kia ...
Read More![](https://sukut.com/wp-content/uploads/2014/09/1_5-670x400.jpg)
Harmony Grove Project
This rough grading project for Standard Pacific included 3,000,000 cubic ...
Read More![](https://sukut.com/wp-content/uploads/2014/04/Crystal-Cove-15DEC03_014_RJ-670x400.jpg)
Crystal Cove
Sukut won the ASCE Project of the Year Award after moving 30 million cubic ...
Read More![](https://sukut.com/wp-content/uploads/2014/04/Pelican-Hill-670x400.jpg)
Pelican Hill Golf Course and Resort
In 1990, Sukut built the world-renowned Pelican Hill golf course. In 2005, ...
Read More![](https://sukut.com/wp-content/uploads/2009/08/STH_06NOV06_030-670x400.jpg)
Headlands Reserve
Located on the beautiful beaches of Dana Point, Headlands Reserve is now ...
Read More![](https://sukut.com/wp-content/uploads/2007/01/Walnut-Hills-2-670x400.jpg)
Walnut Hills – Three Oaks Project
Sukut moved more than 17 million cubic yards of dirt to create 268 mountain ...
Read More![](https://sukut.com/wp-content/uploads/2004/12/Dos-Lagos-670x400.jpg)
Dos Lagos 18 Hole Golf Course
Sukut reclaimed the long-abandoned dumping ground site with an innovative ...
Read MorePublic Works
![](https://sukut.com/wp-content/uploads/2021/12/SPQ-0271-670x400.jpg)
San Pasqual Undergrounding Project
Sukut removed, relocated, and replaced approximately two and a half miles ...
Read More![](https://sukut.com/wp-content/uploads/2021/08/1363-Lower-Elkhorn-Interior-Drainage-670x400.jpg)
Lower Elkhorn Interior Drainage Project
Sacramento Area Flood Control Agency contracted Sukut to construct a ...
Read More![](https://sukut.com/wp-content/uploads/2021/08/CA29-0424-670x400.jpg)
CalTrans Highway 29 Project
Sukut completed this three-mile-long highway realignment project that ...
Read More![](https://sukut.com/wp-content/uploads/2020/08/Cajon-Air-Center-–-Aircraft-Transient-Apron-Project-670x400.jpg)
Cajon Air Center – Aircraft Transient Apron Project
This project of building a transient aircraft apron connecting to existing ...
Read More![](https://sukut.com/wp-content/uploads/2020/01/OIL-0609-670x400.jpg)
Oasis In-Lieu Recharge Project
The project consisted of a 60 AF reservoir, 2835 linear feet of 72-inch ...
Read More![](https://sukut.com/wp-content/uploads/2019/10/Cajon-Air-Center-Drainage-670x400.jpg)
Cajon Air Center Drainage Project
On this project, Sukut installed approximately 3,000 feet of concrete pipe ...
Read More![](https://sukut.com/wp-content/uploads/2019/03/DJI_0269-670x400.jpg)
Hi-Desert Water District Wastewater Reclamation, Phase I, Package D Project
The project included the installation of approximately 40 miles of gravity ...
Read More![](https://sukut.com/wp-content/uploads/2019/01/IMG_0244-670x400.jpg)
Canyon Country Community Center Project
On this project, Sukut performed the following work: clear and grub, ...
Read More![](https://sukut.com/wp-content/uploads/2018/12/WFC-34794-670x400.jpg)
West Fontana Channel Project
This project for San Bernardino County Public Works included the ...
Read More![](https://sukut.com/wp-content/uploads/2018/10/news-awards-670x400.jpg)
La Novia Roundabout Project
The La Novia Roundabout Project was designed to improve traffic flow by ...
Read More![](https://sukut.com/wp-content/uploads/2018/09/HDWD-Barron-Pump-Station-Project-670x400.jpg)
Hi-Desert Water District Barron Pump Station
The work included site clearing and grubbing, trenching, shoring, ...
Read More![](https://sukut.com/wp-content/uploads/2018/08/DJI_0011-670x400.jpg)
CSA 70, Zone W4 – Pioneertown Pipeline Project
The scope of work consisted of the installation of 20,400 linear feet of ...
Read More![](https://sukut.com/wp-content/uploads/2018/07/clinton-keith-complete-670x400.jpg)
Clinton Keith Road Construction Phase 2
Sukut completed new road construction on Clinton Keith Road Construction. ...
Read More![](https://sukut.com/wp-content/uploads/2018/07/1216-2-670x400.jpg)
Cajon Air Center Underground Detention Basin
This project entailed excavating down and installing a two-acre underground ...
Read More![](https://sukut.com/wp-content/uploads/2018/07/1206-670x400.jpg)
La Pata Avenue – Schedule C
This project entailed constructing a new half-a-mile-long road, connecting ...
Read More![](https://sukut.com/wp-content/uploads/2018/07/IBC1214-670x400.jpg)
Industry Business Center West Side Grading Phase 2
This project entailed grading 250 acres, excavation of native unstable ...
Read More![](https://sukut.com/wp-content/uploads/2018/05/IMG_2682-670x400.jpg)
La Pata Avenue Gap Closure Project – Schedule B
Sukut was performing construction services on the La Pata project that ...
Read More![](https://sukut.com/wp-content/uploads/2018/03/Heacock-Channel-Sunnymead-MDP-Line-B-Stages-3-and-4-670x400.jpg)
Heacock Channel (Sunnymead MDP Line B) Stages 3 and 4
This flood control project consisted of dewatering, excavation, and the ...
Read More![](https://sukut.com/wp-content/uploads/2018/03/1248-670x400.jpg)
Hi-Desert Water District Wastewater Reclamation, Phase I, Package C
The project was adjacent next to another Hi-Desert Water District project, ...
Read More![](https://sukut.com/wp-content/uploads/2018/03/clinton-keith-complete-roadway-phs-4-670x400.jpg)
Clinton Keith Road Phase 4 Project
This road project will include roadway and rock excavation for widening ...
Read More![](https://sukut.com/wp-content/uploads/2018/03/2014-Oct-PORT-OF-LA-BERTH-144-145-BACKLANDS-IMPROVEMENTS-670x400.jpg)
Port of Los Angeles
Prime contractor Sukut Construction performed grading and demo operations ...
Read More![](https://sukut.com/wp-content/uploads/2014/04/Pipe-Instllation-Job-13697-Riverside-Drive-670x400.jpg)
Riverside Drive
A long, deep vertical cut was needed to install a storm drain pipe near ...
Read More![](https://sukut.com/wp-content/uploads/2018/03/toll-road_17JAN06_015-670x400.jpg)
Eastern Corridor 241-261 – Toll Road
A design-built project consisting of 26 miles of new roadway including six ...
Read MoreRenewable Energy
![](https://sukut.com/wp-content/uploads/2022/10/August-2023-Top-670x400.png)
Appaloosa Solar Project
Sukut performed the mechanical and module construction of a 200 MWac solar ...
Read More![](https://sukut.com/wp-content/uploads/2022/06/website-670x400.jpg)
Gaskell 2-5 Solar Civil and Mechanical Project
Sukut constructed a 100 MWac solar project in the Rosamond area. The civil ...
Read More![](https://sukut.com/wp-content/uploads/2022/06/Calpine-BESS-670x400.jpg)
Santa Ana BESS Project
Sukut completed site preparation work, trenching, and paving for the civil ...
Read More![](https://sukut.com/wp-content/uploads/2021/03/TranquilityBESS-0919-670x400.jpg)
Tranquillity BESS Project
Rosendin Electric selected Sukut to perform the civil scope on the 72 MW ...
Read More![](https://sukut.com/wp-content/uploads/2020/10/Aktina-0001-670x400.jpg)
Aktina Solar Project
Rosendin Electric contracted Sukut to complete the mechanical scope at the ...
Read More![](https://sukut.com/wp-content/uploads/2020/02/CopperMT-30679-670x400.jpg)
Copper Mountain 5 Solar Civil Project
The project consisted of over 1,100 acres of grading, 20 miles of ...
Read More