Projects > Completed
Alternative Energy

Santa Ana BESS Project
Sukut completed site preparation work, trenching, and paving for the civil ...
Read More
Mustang BESS Civil Project
Sukut will perform civil, concrete, and trenching scope on this battery ...
Read More
Tranquillity BESS Project
Rosendin Electric selected Sukut to perform the civil scope on the 72 MW ...
Read More
Townsite Solar Civil, Piles, and Racking Project
Sukut is constructing a 200 MW solar project, completing the civil, ...
Read More
Todd Solar Project
Sukut is installing the FTC racking system on a 25MW solar farm in Maryland ...
Read More
Aktina Solar Project
Rosendin Electric contracted Sukut to complete the mechanical scope at the ...
Read More
Eastline Solar Civil Mechanical (Piles and Racking) and Electrical Trenching Project
This project consists of the construction of a 100 MWAC solar site and ...
Read More
TWC Westside Solar Civil and Pile Driving Project
This project is the last phase of the previous TWC Westside Solar projects: ...
Read More
Copper Mountain 5 Solar Civil Project
The project consists of over 1,100 acres of grading, 20 miles of electrical ...
Read More
Rosamond Central Solar Civil and Trenching Project
Sukut will be performing clearing and grading of an 195 MWac 1100-acre ...
Read More
Techren 3, 4, 5 Solar Civil and Mechanical Project
Techren site is a 115 MW photovoltaic solar farm located in Boulder City, ...
Read More
Desert Harvest 1 and 2 Access Roads Project
This project includes construction of 105,600 linear feet of 20 and 16-foot ...
Read More
Rancho Seco Solar Civil and Trenching Site Work
This civil site work project is located on a 160 MW solar site and consists ...
Read More
Blythe 3 Solar Civil and Pile Driving Project
This project includes the construction of a 1000-acre, 125 MWac solar site. ...
Read More
TWC Solar – New Columbia and Belridge Solar Civil and Mechanical project
Sukut was awarded a TWC Solar – New Columbia and Belridge Solar Civil and ...
Read More
CIW Solar Civil Project
On this project, Sukut is performing clearing, grading, and access road ...
Read More
Los Coches Substation Modification
Sukut constructed Phase 1 of 3 for SDG&E to accommodate upgraded 138kV ...
Read More
Solar Oasis Project
Sukut completed work on this 20 MW AC solar array project that was built on ...
Read More
Calipatria and Centinela Solar Civil and Mechanical Projects
This project consists of two separate 12 MW sites in which Sukut will be ...
Read More
Moapa Southern Paiute Solar, Phases 1 and 2 Project
Sukut provided grading and trenching services on the Moapa Southern Paiute ...
Read More
Garland Solar
Sukut completed the site preparation on this solar project in three phases ...
Read More
Westside Solar Civil, Trenching and Pile Driving Project
Sukut performed grading, trenching, road construction and post-installation ...
Read More
EMWD Solar Energy Site Prep PH3 Project
This project includes site development at four of the district’s regional ...
Read More
Voyager Wind Trench Backfill Project
The scope of work consists of screening and backfilling of a medium voltage ...
Read More
Southampton Solar Civil
Sukut performed excavation, new roadway construction and installation of ...
Read More
Gloucester Solar Civil Project
This project involves the construction of a 20 MW 150 acre solar site in ...
Read More
East County Substation
Sukut Construction performed 1.1 million yards of mass grading to construct ...
Read More
Antelope Expansion 2 Solar Access Road Project
On this project Sukut will construct approximately 2.2 million square feet ...
Read More
Panoche Valley Solar Phase 2 Civil Project
The scope of work involves civil improvements to a 600 acre photovoltaic ...
Read More
Panoche Valley Solar MV/DC Projects
This project in Panoche, San Benito County, CA, involves excavation and ...
Read More
Wistaria Solar Civil and Trenching Project
The project included civil work for a 745-acre site, construction of ...
Read More
Summer and Winter Wheats Solar Civil Project
Sukut was awarded the Summer and Winter Wheats Solar Civil Project, located ...
Read More
Mojave Solar Project
Sukut Construction completed the civil site preparation in 2012 for the ...
Read More
Genesis Solar Energy Project
Sukut constructed 80,000 cubic yards of soil cement lined slopes in a five ...
Read MoreDams and Reservoirs

Trampas Canyon Dam and Reservoir Project
The Santa Margarita Water District contracted with Sukut to complete the ...
Read More
Upper Chiquita Reservoir Slope Repair
Sukut is performing repair services on the 1.5:1 slope that was damaged ...
Read More
Calaveras Dam Replacement Project
Sukut and our valued joint venture partners, Dragados USA and Flatiron, are ...
Read More

San Pablo Dam Seismic Project
Sukut teamed with Raito, Inc. to upgrade San Pablo Dam by removing the ...
Read More
Upper Chiquita Reservoir
The Upper Chiquita Reservoir project required the excavation and placement ...
Read MoreEnvironmental Services

Antelope Valley Public Landfill Cell Phase V-B Project
This project for Waste Management consists of 1.5 million cubic yards of ...
Read More
Prima Deshecha Landfill Zone 1 Phase D2 Liner and Groundwater Project
Sukut is working on the expansion of the groundwater protection liner ...
Read More
El Sobrante Landfill Phase 13A Project
This project included clearing, excavating 4,500,000 cubic yards of ...
Read More
FRB Landfill East Flank Northern Diverted Channel Project
This project involves mass grading and concrete construction work to build ...
Read More
FRB Phase VIIIB Fire Repair Project
This project includes the removal and replacement of damaged geosynthetic ...
Read More
Northern Branch for the 2020 Fire Debris and Tree Removal Project
Sukut entered into a joint venture with Pacific States Environmental ...
Read More
Tree Removal Services Project for the Camp Fire in Butte County
Acting as a Managing Partner, Sukut entered into a joint venture with Odin ...
Read More
Badlands Landfill C2P5 and C3P2 Liner Expansion Project
This project involves over 10,000 cubic yards of excavation and engineered ...
Read More
Altamont Landfill – FA 2 Phase 3 Cell Construction & Stormwater Improvements
This phase of the Altamont project includes excavation of 2.6 million cubic ...
Read More
Riverside County Landfills Daily Cover Excavation and On-Call Improvements Project
This project consists of 200,000 cubic yards of daily cover excavation and ...
Read More
Visalia Landfill Phase 4 Expansion Project
This project includes mass excavation of 355,000 cubic yards of material ...
Read More
Sunshine Canyon Landfill CC-4 Part 4A Mass Excavation and Liner Project
This project includes the construction of a 4.5-acre cell, which consists ...
Read More
Ox Mountain Landfill Phase XXI Liner Project
This project involves the excavation of 100,000 cubic yards of hard rock to ...
Read More
Keller Canyon Landfill Phase 3C Liner System Project
This six-acre cell construction project includes 30,000 cubic yards of ...
Read More
Prima Capistrano Greenery Project
This project involves moving over 100,000 cubic yards of dirt and providing ...
Read More
FRB Bee Canyon Greenery Project
This project consists of 740,000 cubic yards of earthwork, construction of ...
Read More
FRB Landfill Wetlands Basin Repair Project
Sukut will remediate the damage caused by a breach in a wetlands basin ...
Read More
Sunshine Canyon Office Relocation Project
This project’s intent was to relocate existing offices to a new location. ...
Read More
El Sobrante Landfill Phase 12 Liner and LCRS and Phase C2 Partial Final Closure Project
This is a combination of two projects. The first project is a 10-acre ...
Read More
California Street Landfill Phase 4 Expansion Project
On this project, Sukut is constructing a new landfill cell, including mass ...
Read More
San Timoteo Sanitary Landfill Unit 2 Phases 3-2 and 4 Groundwater Protection System Composite Liner Construction project
The work on this project includes excavation of up to two million cubic ...
Read More
Calabasas Landfill Project
Sukut is working at this emergency liner repair project in Agoura, CA. The ...
Read More
Sycamore Landfill Project
Sukut is working on a landfill expansion at the Sycamore Canyon Landfill. ...
Read More
Sonoma Landfill CC-3 Construction Project
This landfill expansion project consists of 20,000 cubic yards of ...
Read More
Altamont Landfill FA2 Phases 2 and 2B Containment, and Phase 3 Expansion Project
The project includes excavation of 1.4 million cubic yards of soil needed ...
Read More
Chiquita Canyon Landfill C6 Liner Project
The project included excavation of 1 million cubic yards of soil for the ...
Read More
Sunshine Canyon DWP Waterline Project
The project consists of replacing the landfill’s existing HDPE ...
Read More
Butte Fire Debris Removal Project
The Butte Fire that started on September 9, burned 70,868 acres. In the ...
Read More
Sunshine Canyon Landfill CC-4P3 Liner Construction Project
This mass excavation project consists of 700,000 cubic yards of material to ...
Read More
Camp Fire Debris Removal Cleanup Project
Sukut entered into a joint venture with Goodfellow Bros. and Pacific States ...
Read More
El Sobrante LF Phase C 1 Partial Final Closure Project
This project for Waste Management consists of approximately 1.5 million ...
Read More
Mid Valley Landfill Unit 4 Ph 1 Liner Construction
The project includes installation of 24-inch thick low permeability ...
Read More
Clear Lake Shoreline Cleanup
This project involved an emergency cleanup of wildfire debris that was ...
Read More
Frank R. Bowerman Landfill Crews Quarters and Storage Facility
The project consisted of the design, permitting and construction of modular ...
Read More
FRB Groundwater Protection System
Sukut performed work on the Groundwater Protection System project, ...
Read More
Olinda Alpha Landfill Phase 2
Sukut continued work at the active Olinda Alpha Landfill with the Phase 2 ...
Read More
Altamont LF – Compost Facility Grading & Drainage
Sukut Construction worked closely with subcontractors to move in excess of ...
Read More
Wildfire Post Debris Removal
Sukut has been contracted by the California Governor’s Office of Emergency ...
Read More
Fink Road Landfill – 2 Cell 6 Composite Liner Project
This project for Stanislaus County consists of a 17 AC expansion which ...
Read More
Savage Canyon Landfill Liner Project
The scope of work includes 430,000 cubic yards of mass excavation and ...
Read More
Sunshine Canyon Landfill Buttress
Work consists of 4 million cubic yards of excavated material along with the ...
Read More
Sunshine Canyon LF Cell CC-4 P2 Liner Project
Sukut completed a 5.8-acre cell construction, consisting of a five-layer ...
Read More
The Sunshine Canyon Landfill Vegetative Cover Project
The Sunshine Canyon Landfill Vegetative Cover Project consists of placing ...
Read More
Santa Rosa/Napa Fire Debris Cleanup Project
Sukut Construction was awarded the Santa Rosa/Napa Fire Debris Cleanup ...
Read More
Salton City Landfill Phase 1B Cell Construction
Sukut Construction was awarded the Salton City Landfill Phase 1B Cell ...
Read More
Thomas Fire Project
Thomas Fire was the largest fire in the state of California that destroyed ...
Read More
Detwiler Fire Debris Removal and Recovery
The project scope includes removal, storage, transportation, and disposal ...
Read More
Prima Deshecha Landfill Zone 1 Phase D Mass Excavation and Liner Project
The project consists of construction of a composite liner system including ...
Read More
Lancaster Landfill Liner Phase 1b and 1c
Liner expansion construction included mass excavation, engineered fill, ...
Read More
FRB Landfill Main Haul Road Crossing Repair
Sukut completed emergency repair of the storm drain inlet and road crossing ...
Read More
Mid-Valley Landfill and Liner Expansion
Mid Valley landfill is an active municipal landfill that opened Unit Three ...
Read More
Newberry and Yermo Sanitary Landfills
Sukut Construction excavated and stockpiled 60,000 cubic yards of soil. We ...
Read More
Palmdale Water Reclamation Plant
Palmdale Water Reclamation Plant Stage Five Effluent Management Facilities ...
Read More
San Bernardino County Fire Response – Grass Valley
This project consisted of a massive debris removal operation for 284 homes ...
Read More
Lancaster Water Treatment Plant
Sukut constructed four, 70-acre waste water treatment ponds. This project ...
Read More
Carson Marketplace
Read More
Frank R. Bowerman Landfill
Located in Irvine, Sukut developed a new landfill cell including mass earth ...
Read More
Steel Mill Slag Pile
Sukut Construction excavated the existing slag pile to a designed sub ...
Read More
Prima Deshecha – Landfill
This project supported the landfill expansion and placement of liners in ...
Read More
Guadalupe Landfill
Guadalupe Landfill is an active landfill utilizing an active landfill gas ...
Read More
Jamestown Landfill Closure
Jamestown landfill is an inactive landfill that was originally closed in ...
Read More

San Timoteo Sanitary Landfill
Sukut Construction has provided the San Bernardino County with landfill ...
Read More
Rancho Bernardo – FR
This project consisted of a massive debris removal operation for homes that ...
Read More
Tracy Tire Fire Site Remediation Services
After burning for two and one-half years, Sukut was called upon to ...
Read More
Puente Hills Landfill Slope Stabilization and Roads
Sukut Construction has been involved for many years with the Puente Hills ...
Read More
Lake Tahoe Fire Response
Sukut was part of a CIWMB response team that completed the Angora Debris ...
Read More
West Miramar Landfill
Sukut Construction was contracted by the City of San Diego to perform final ...
Read MorePrivate Works

RMV Rienda Storm Drain Project
This project involves the installation of a large RCP storm drain up to, ...
Read More
Cow Camp Road Phase 2B and SMVD Improvements Project
The Cow Camp Road 2B Roadway & SMWD Improvements project in Rancho ...
Read More
FedEx Ontario Airport Taxiway A Project
Sukut was awarded the FedEx Ontario Airport Taxiway A project in Ontario, ...
Read More
RMV PA 3.1 and CCR Rough Grading Project
Project includes mass excavation of 3,000,000 cubic yards and nearly ...
Read More
Los Patrones Parkway Improvements Phase 2 Project
The project includes the restoration of median and shoulder grading for ...
Read More
FedEx Ontario Airport Expansion Project
On this project, Sukut will be handling 450,000 cubic yards of ...
Read More
Orchard Hills, Rough Grading And Storm Drain
Sukut moved over three million cubic yards of dirt and rock to create 223 ...
Read More
Hidden Canyon PA 18
Sukut moved over 3.2 million cubic yards of dirt and rock to create 258 ...
Read More
Thompson Ranch
This 3.8-million cubic yard residential grading project was a great success ...
Read More
Moorpark William Lyon Homes, Tract #5187
This residential grading project was located on a 350-acre land west of ...
Read More
St. John’s Seminary Rough Grading Project
This Southern California residential development project involved over two ...
Read More
Spencer’s Crossing – Tracts 37053-2 and 37053
A Rough Grading Project located in Murrieta within in the County of ...
Read More

Rancho Mission Viejo The Ranch – PA 2.3 ,2.4 Los Patrones Grading and Storm Drain
Sukut installed 12,000 linear feet of storm drain ranging from 18” to 72”. ...
Read More
Rolling Hills Country Club Grading and Storm Drain
This project involved the transforming of the existing golf course and ...
Read More
Porter Ranch Project
This hillside residential grading project was the last phase of the Porter ...
Read More
Los Olivos Basin
Los Olivos Basin project involves the construction of multiple improvements ...
Read More
Serrano Summit Rough Grading Project
Sukut Construction was awarded the Serrano Summit Rough Grading Project, ...
Read More
Hyundai-Kia Proving Ground
Sukut graded and paved a 6.5 mile oval test track for the Hyundai/Kia ...
Read More
Harmony Grove Project
This rough grading project for Standard Pacific included 3,000,000 cubic ...
Read More
Lake Forest Drive – Phase 2
The project consisted of 26 acres of grading work that included rough ...
Read More
Crystal Cove
Sukut won the ASCE Project of the Year Award after moving 30 million cubic ...
Read More
Pelican Hill Golf Course and Resort
In 1990, Sukut built the world-renowned Pelican Hill golf course. In 2005, ...
Read More
Spectrum 5 at Serrano Creek
Sukut is known to complete a difficult project on time and in very adverse ...
Read More
Marshburn Storm Drain and South Channel Improvements
The land where the storm drain project was located was being leased by a ...
Read More
Headlands Reserve
Located on the beautiful beaches of Dana Point, Headlands Reserve is now ...
Read More


Audie Murphy Ranch
The $35.5 million dollar development of 650 acres into 800 housing lots ...
Read More
Portola Springs
This project was to rough grade a housing tract under a tight deadline. ...
Read More
Walnut Hills – Three Oaks Project
Sukut moved more than 17 million cubic yards of dirt to create 268 mountain ...
Read More

Dos Lagos 18 Hole Golf Course
Sukut reclaimed the long-abandoned dumping ground site with an innovative ...
Read More
Public Works

Palm Canyon Wash, Stage 93 Emergency Levee Restoration Project
This emergency work contract consists of the repair and restoration of ...
Read More
Cajon Air Center – Aircraft Transient Apron Project
This project of building a transient aircraft apron connecting to existing ...
Read More
Oasis In-Lieu Recharge Project
The project consists of a 60 AF reservoir, 2835 linear feet of 72-inch ...
Read More
Cajon Air Center Drainage Project
On this project, Sukut installed approximately 3,000 feet of concrete pipe ...
Read More
New Model Colony Archibald and Edison Infrastructure Improvements
Sukut worked as a general contractor on the roadway and utility improvement ...
Read More
Hi-Desert Water District Wastewater Reclamation, Phase I, Package D Project
The project included the installation of approximately 40 miles of gravity ...
Read More
Canyon Country Community Center Project
On this project, Sukut performed the following work: clear and grub, ...
Read More
West Fontana Channel Project
This project for San Bernardino County Public Works included the ...
Read More
Hi-Desert Water District Barron Pump Station
The work includes site clearing and grubbing, trenching, shoring, ...
Read More
CSA 70, Zone W4 – Pioneertown Pipeline Project
The scope of work consists of the installation of 20,400 linear feet of DIP ...
Read More
Technology Drive Street Improvements
This project involved Technology Drive Street improvements near Laguna ...
Read More
RMV Multi-Purpose Path
Sukut created a multi-purpose pathway for the residents of Rancho Mission ...
Read More
Clinton Keith Road Construction Phase 2
Sukut completed new road construction on Clinton Keith Road Construction. ...
Read More
Veterans Sports Park at Tustin Legacy
The Site was previously operated as a community park by the Department of ...
Read More
Cajon Air Center Underground Detention Basin
This project entailed excavating down and installing a 2 acre underground ...
Read More
Haven Avenue SD & Sewer
Sukut Construction successfully completed installation of underground ...
Read More
La Pata Avenue – Schedule C
This project entails a new road a 1/2 mile long, connecting Camino Del Rio ...
Read More
Industry Business Center West Side Grading Phase 2
This project entails grading 250 acres, excavation of native unstable soil ...
Read More
La Pata Avenue Gap Closure Project – Schedule B
Sukut was performing construction services on the La Pata project that ...
Read More
Heacock Channel (Sunnymead MDP Line B) Stages 3 and 4
This flood control project consists of dewatering, excavation, and the ...
Read More
Moffett and Legacy Roadway Extension Project
The project involves grading, installation of approximately 3,000 lf of new ...
Read More
Orange County Great Park Western Sector Roadway Project
The project includes removal of existing utilities and roadway in order to ...
Read More
Hi-Desert Water District Wastewater Reclamation, Phase I, Package C
Sukut was awarded a $28.7 million Wastewater Reclamation Project, located ...
Read More
Clinton Keith Road Phase 4 Project
This road project will include roadway and rock excavation for widening ...
Read More
Peters Canyon Channel Widening
Sukut conducted the final export operation required to complete the ...
Read More
Port of Los Angeles
Prime contractor Sukut Construction performed grading and demo operations ...
Read More
Central Avenue Realignment
Sukut performed the realignment of Central Ave. including constructing a ...
Read More
Riverside Drive
A long, deep vertical cut was needed to install storm drain pipe near dairy ...
Read More
Route 905 – 6 Lane Fwy San Diego
Sukut Construction joined forces with Flatiron West, Inc. in a Joint ...
Read More
Oxnard Airport
Sukut eliminated two aviation hazards caused by large open channels near ...
Read More
Tustin Armstrong
Sukut poured concrete for the 900 linear foot reinforced concrete box ...
Read More
Channel Islands Campus
This was a turn key infrastructure project including two bridges, sewer and ...
Read More
Robert B. Diemer Water Treatment Plant North Access Road
Sukut constructed a one-mile hill side access road for the Metropolitan ...
Read More
Cathedral City – Cove Infrastructure
Sukut upgraded outdated water, sewer and storm drainage systems, eliminate ...
Read More
Hillcrest High School
This new 50 acre campus for the new Hillcrest High School was recognized by ...
Read More
State Route 76 Widening & Realignment
Subcontractor to Granite Construction, Sukut excavated 325,000 cubic yards ...
Read More
Monument 250 Border Fence
This project entails the construction of six miles of border access road ...
Read More
Eastern Corridor 241-261 – Toll Road
A design-built project consisting of 26 miles of new roadway including six ...
Read More
Santa Ana River Trail
Sukut moved 35,000 cubic yards of dirt to accomplish this three and a half ...
Read More
Pepperdine University Graduate Campus
This project involved the movement of 3,000,000 cubic yards of earth in ...
Read More