Alternative Energy

Desert Harvest 1 and 2 Access Roads Project

This project includes construction of 105,600 linear feet of 20 and 16-foot ...

Read More

Los Coches Substation Modification

Sukut constructed Phase 1 of 3 for SDG&E to accommodate upgraded 138kV ...

Read More

Solar Oasis Project

Sukut completed work on this 20 MW AC solar array project that was built on ...

Read More

Calipatria and Centinela Solar Civil and Mechanical Projects

This project consists of two separate 12 MW sites in which Sukut will be ...

Read More

Moapa Southern Paiute Solar, Phases 1 and 2 Project

Sukut provided grading and trenching services on the Moapa Southern Paiute ...

Read More

Garland Solar

Sukut completed the site preparation on this solar project in three phases ...

Read More

Westside Solar Civil, Trenching and Pile Driving Project

Sukut performed grading, trenching, road construction and post-installation ...

Read More

Voyager Wind Trench Backfill Project

The scope of work consists of screening and backfilling of a medium voltage ...

Read More

Southampton Solar Civil

Sukut performed excavation, new roadway construction and installation of ...

Read More

Gloucester Solar Civil Project

This project involves the construction of a 20 MW 150 acre solar site in ...

Read More

East County Substation

Sukut Construction performed 1.1 million yards of mass grading to construct ...

Read More

Antelope Expansion 2 Solar Access Road Project

On this project Sukut will construct approximately 2.2 million square feet ...

Read More

Panoche Valley Solar Phase 2 Civil Project

The scope of work involves civil improvements to a 600 acre photovoltaic ...

Read More

Panoche Valley Solar MV/DC Projects

This project in Panoche, San Benito County, CA, involves excavation and ...

Read More

Wistaria Solar Civil and Trenching Project

The project included civil work for a 745-acre site, construction of ...

Read More

Summer and Winter Wheats Solar Civil Project

Sukut was awarded the Summer and Winter Wheats Solar Civil Project, located ...

Read More

Mojave Solar Project

Sukut Construction completed the civil site preparation in 2012 for the ...

Read More

Genesis Solar Energy Project

Sukut constructed 80,000 cubic yards of soil cement lined slopes in a five ...

Read More

Environmental Services

Calabasas Landfill Project

Sukut is working at this emergency liner repair project in Agoura, CA. The ...

Read More

Sycamore Landfill Project

Sukut is working on a landfill expansion at the Sycamore Canyon Landfill. ...

Read More

Sunshine Canyon DWP Waterline Project

The project consists of replacing the landfill’s existing HDPE ...

Read More

Butte Fire Debris Removal Project

The Butte Fire that started on September 9, burned 70,868 acres. In the ...

Read More

Camp Fire Debris Removal Cleanup Project

Sukut entered into a joint venture with Goodfellow Bros. and Pacific States ...

Read More

Mid Valley Landfill Unit 4 Ph 1 Liner Construction

The project includes installation of 24-inch thick low permeability ...

Read More

Clear Lake Shoreline Cleanup

This project involved an emergency cleanup of wildfire debris that was ...

Read More

Frank R. Bowerman Landfill Crews Quarters and Storage Facility

The project consisted of the design, permitting and construction of modular ...

Read More

Olinda Alpha Landfill Phase 2

Sukut continued work at the active Olinda Alpha Landfill with the Phase 2 ...

Read More

Altamont LF – Compost Facility Grading & Drainage

Sukut Construction worked closely with subcontractors to move in excess of ...

Read More

Wildfire Post Debris Removal

Sukut has been contracted by the California Governor’s Office of Emergency ...

Read More

Fink Road Landfill – 2 Cell 6 Composite Liner Project

This project for Stanislaus County consists of a 17 AC expansion which ...

Read More

Savage Canyon Landfill Liner Project

The scope of work includes 430,000 cubic yards of mass excavation and ...

Read More

Sunshine Canyon Landfill Buttress

Work consists of 4 million cubic yards of excavated material along with the ...

Read More

Sunshine Canyon LF Cell CC-4 P2 Liner Project

Sukut completed a 5.8-acre cell construction, consisting of a five-layer ...

Read More

The Sunshine Canyon Landfill Vegetative Cover Project

The Sunshine Canyon Landfill Vegetative Cover Project consists of placing ...

Read More

Santa Rosa/Napa Fire Debris Cleanup Project

Sukut Construction was awarded the Santa Rosa/Napa Fire Debris Cleanup ...

Read More

Salton City Landfill Phase 1B Cell Construction

Sukut Construction was awarded the Salton City Landfill Phase 1B Cell ...

Read More

Thomas Fire Project

Thomas Fire was the largest fire in the state of California that destroyed ...

Read More

Detwiler Fire Debris Removal and Recovery

The project scope includes removal, storage, transportation, and disposal ...

Read More

Prima Deshecha Landfill Zone 1 Phase D Mass Excavation and Liner Project

The project consists of construction of a composite liner system including ...

Read More

Lancaster Landfill Liner Phase 1b and 1c

Liner expansion construction included mass excavation, engineered fill, ...

Read More

FRB Landfill Main Haul Road Crossing Repair

Sukut completed emergency repair of the storm drain inlet and road crossing ...

Read More

Mid-Valley Landfill and Liner Expansion

Mid Valley landfill is an active municipal landfill that opened Unit Three ...

Read More

Newberry and Yermo Sanitary Landfills

Sukut Construction excavated and stockpiled 60,000 cubic yards of soil. We ...

Read More

Palmdale Water Reclamation Plant

Palmdale Water Reclamation Plant Stage Five Effluent Management Facilities ...

Read More

San Bernardino County Fire Response – Grass Valley

This project consisted of a massive debris removal operation for 284 homes ...

Read More

Lancaster Water Treatment Plant

Sukut constructed four, 70-acre waste water treatment ponds. This project ...

Read More

Carson Marketplace

Read More

Frank R. Bowerman Landfill

Located in Irvine, Sukut developed a new landfill cell including mass earth ...

Read More

Steel Mill Slag Pile

Sukut Construction excavated the existing slag pile to a designed sub ...

Read More

Prima Deshecha – Landfill

This project supported the landfill expansion and placement of liners in ...

Read More

Guadalupe Landfill

Guadalupe Landfill is an active landfill utilizing an active landfill gas ...

Read More

Jamestown Landfill Closure

Jamestown landfill is an inactive landfill that was originally closed in ...

Read More

Calabasas Landfill

This 35-acre project included mass excavation, installation of an ...

Read More

San Timoteo Sanitary Landfill

Sukut Construction has provided the San Bernardino County with landfill ...

Read More

Rancho Bernardo – FR

This project consisted of a massive debris removal operation for homes that ...

Read More

Tracy Tire Fire Site Remediation Services

After burning for two and one-half years, Sukut was called upon to ...

Read More

Puente Hills Landfill Slope Stabilization and Roads

Sukut Construction has been involved for many years with the Puente Hills ...

Read More

Lake Tahoe Fire Response

Sukut was part of a CIWMB response team that completed the Angora Debris ...

Read More

West Miramar Landfill

Sukut Construction was contracted by the City of San Diego to perform final ...

Read More

Private Works

Orchard Hills, Rough Grading And Storm Drain

Sukut moved over three million cubic yards of dirt and rock to create 223 ...

Read More

Hidden Canyon PA 18

Sukut moved over 3.2 million cubic yards of dirt and rock to create 258 ...

Read More

Thompson Ranch

This 3.8-million cubic yard residential grading project was a great success ...

Read More

Moorpark William Lyon Homes, Tract #5187

This residential grading project was located on a 350-acre land west of ...

Read More

Spencer’s Crossing – Tracts 37053-2 and 37053

A Rough Grading Project located in Murrieta within in the County of ...

Read More

Hollywood Hills

Project included construction and operation of 4,300 linear feet of ...

Read More

Rancho Mission Viejo The Ranch – PA 2.3 ,2.4 Los Patrones Grading and Storm Drain

Sukut installed 12,000 linear feet of storm drain ranging from 18” to 72”.  ...

Read More

Rolling Hills Country Club Grading and Storm Drain

This project involved the transforming of the existing golf course and ...

Read More

Porter Ranch Project

This hillside residential grading project was the last phase of the Porter ...

Read More

Serrano Summit Rough Grading Project

Sukut Construction was awarded the Serrano Summit Rough Grading Project, ...

Read More

Hyundai-Kia Proving Ground

Sukut graded and paved a 6.5 mile oval test track for the Hyundai/Kia ...

Read More

Harmony Grove Project

This rough grading project for Standard Pacific included 3,000,000 cubic ...

Read More

Lake Forest Drive – Phase 2

The project consisted of 26 acres of grading work that included rough ...

Read More

Crystal Cove

Sukut won the ASCE Project of the Year Award after moving 30 million cubic ...

Read More

Pelican Hill Golf Course and Resort

In 1990, Sukut built the world-renowned Pelican Hill golf course. In 2005, ...

Read More

Spectrum 5 at Serrano Creek

Sukut is known to complete a difficult project on time and in very adverse ...

Read More

Marshburn Storm Drain and South Channel Improvements

The land where the storm drain project was located was being leased by a ...

Read More

Headlands Reserve

Located on the beautiful beaches of Dana Point, Headlands Reserve is now ...

Read More

Otay Quarry

This quarry is located adjacent to the Sleep Train Amphitheater in Chula ...

Read More

Summit Crest

Sukut graded the six acre hillside project at Pittsford and Osterman in ...

Read More

Audie Murphy Ranch

The $35.5 million dollar development of 650 acres into 800 housing lots ...

Read More

Portola Springs

This project was to rough grade a housing tract under a tight deadline. ...

Read More

Walnut Hills – Three Oaks Project

Sukut moved more than 17 million cubic yards of dirt to create 268 mountain ...

Read More

Kohl Ranch

A marshy track of property needed grading to create usable land for a ...

Read More

Dos Lagos 18 Hole Golf Course

Sukut reclaimed the long-abandoned dumping ground site with an innovative ...

Read More

Stone Crest

This project consisted of the grading of 98 acres of land and the ...

Read More

Public Works

New Model Colony Archibald and Edison Infrastructure Improvements

Sukut worked as a general contractor on the roadway and utility improvement ...

Read More

Hi-Desert Water District Barron Pump Station

The work includes site clearing and grubbing, trenching, shoring, ...

Read More

CSA 70, Zone W4 – Pioneertown Pipeline Project

The scope of work consists of the installation of 20,400 linear feet of DIP ...

Read More

Technology Drive Street Improvements

This project involved Technology Drive Street improvements near Laguna ...

Read More

RMV Multi-Purpose Path

Sukut created a multi-purpose pathway for the residents of Rancho Mission ...

Read More

Clinton Keith Road Construction Phase 2

Sukut completed new road construction on Clinton Keith Road Construction. ...

Read More

Veterans Sports Park at Tustin Legacy

The Site was previously operated as a community park by the Department of ...

Read More

Cajon Air Center Underground Detention Basin

This project entailed excavating down and installing a 2 acre underground ...

Read More

Haven Avenue SD & Sewer

Sukut Construction successfully completed installation of underground ...

Read More

La Pata Avenue – Schedule C

This project entails a new road a 1/2 mile long, connecting Camino Del Rio ...

Read More

Industry Business Center West Side Grading Phase 2

This project entails grading 250 acres, excavation of native unstable soil ...

Read More

La Pata Avenue Gap Closure Project – Schedule B

Sukut was performing construction services on the La Pata project that ...

Read More

Upper Chiquita Reservoir Slope Repair

Sukut is performing repair services on the 1.5:1 slope that was damaged ...

Read More

Moffett and Legacy Roadway Extension Project

The project involves grading, installation of approximately 3,000 lf of new ...

Read More

Hi-Desert Water District Wastewater Reclamation, Phase I, Package C

Sukut was awarded a $28.7 million Wastewater Reclamation Project, located ...

Read More

Clinton Keith Road Phase 4 Project

This road project will include roadway and rock excavation for widening ...

Read More

Peters Canyon Channel Widening

Sukut conducted the final export operation required to complete the ...

Read More

San Vicente Dam

Sukut Construction worked as a subcontractor on the San Vicente Dam ...

Read More

Port of Los Angeles

Prime contractor Sukut Construction performed grading and demo operations ...

Read More

Central Avenue Realignment

Sukut performed the realignment of Central Ave. including constructing a ...

Read More

Riverside Drive

A long, deep vertical cut was needed to install storm drain pipe near dairy ...

Read More

Oxnard Airport

Sukut eliminated two aviation hazards caused by large open channels near ...

Read More

Tustin Armstrong

Sukut poured concrete for the 900 linear foot reinforced concrete box ...

Read More

Channel Islands Campus

This was a turn key infrastructure project including two bridges, sewer and ...

Read More

Robert B. Diemer Water Treatment Plant North Access Road

Sukut constructed a one-mile hill side access road for the Metropolitan ...

Read More

San Pablo Dam Seismic Project

Sukut teamed with Raito, Inc. to upgrade San Pablo Dam by removing the ...

Read More

Upper Chiquita Reservoir

The Upper Chiquita Reservoir project required the excavation and placement ...

Read More

Cathedral City – Cove Infrastructure

Sukut upgraded outdated water, sewer and storm drainage systems, eliminate ...

Read More

Hillcrest High School

This new 50 acre campus for the new Hillcrest High School was recognized by ...

Read More

State Route 76 Widening & Realignment

Subcontractor to Granite Construction, Sukut excavated 325,000 cubic yards ...

Read More

Monument 250 Border Fence

This project entails the construction of six miles of border access road ...

Read More

Santa Ana River Trail

Sukut moved 35,000 cubic yards of dirt to accomplish this three and a half ...

Read More

Pepperdine University Graduate Campus

This project involved the movement of 3,000,000 cubic yards of earth in ...

Read More

Special Projects / Joint Ventures

Calaveras Dam Replacement Project

Sukut and our valued joint venture partners, Dragados USA and Flatiron, are ...

Read More

Route 905 – 6 Lane Fwy San Diego

Sukut Construction joined forces with Flatiron West, Inc. in a Joint ...

Read More

Eastern Corridor 241-261 – Toll Road

A design-built project consisting of 26 miles of new roadway including six ...

Read More