Oasis In-Lieu Recharge Project

The project consists of a 60 AF reservoir, 2835 linear feet of 72-inch steel pipeline, the Oasis Tower bypass system, irrigation lateral 97.1 Tie-In, and a reinforced concrete control structure that includes pumps, motors, valves, couplings and appurtenances. The work will also include a reservoir liner, electrical and surface restoration.Read more

Cajon Air Center Drainage Project

On this project, Sukut installed approximately 3,000 feet of concrete pipe in the location of the existing earthen swale used for storm water conveyance, and 820 feet of an additional RCB from the center of the new concrete pipe, connecting to an underground detention basin. The project also included the installation of separated ingress and…Read more

New Model Colony Archibald and Edison Infrastructure Improvements

Sukut worked as a general contractor on the roadway and utility improvement project that included construction of five miles of roadway improvements and 120,000 linear feet of pipe work in the City of Ontario. Sukut self-performed more than 50% of the work including: excavation, pipeline and appurtenance installation (including air vacs, fire hydrants, blow offs,…Read more

Canyon Country Community Center Project

On this project, Sukut performed the following work: clear and grub, demolition of an existing concrete channel, rough grading, HDPE storm drain, installation of a temporary detention basin, construction of a temporary diversion channel, water treatment facility, fencing, RCP, double RCB measuring 23-feet wide by 10-feet high, new concrete channel, concrete access road, gravel yard,…Read more

West Fontana Channel Project

This project for San Bernardino County Public Works included the construction of a three-mile-long reinforced concrete rectangular channel, with adjacent asphalt paving work, pre-cast reinforced concrete box culverts, piping, installation of chain link fencing and gates, relocation of street lights, electrical work, gas lines, and telephone lines.Read more

Hi-Desert Water District Barron Pump Station

The work includes site clearing and grubbing, trenching, shoring, excavation, backfill, and compaction.  Additionally, the scope including the installation of the pump station and associated control equipment. A flow meter vault will also be constructed, as well as a diversion structure, manhole, underground piping, valves, instruments, and electrical.  Sukut will also install air condition, precast…Read more

CSA 70, Zone W4 – Pioneertown Pipeline Project

The scope of work consists of the installation of 20,400 linear feet of DIP and 40,800 linear feet of fiber optic communication. The project also includes two lift stations along with booster pumps, electrical power, control panels, communication electronics, pumps, and above and below ground holding tanks.  Additionally, Sukut will perform cold planning, asphalt paving,…Read more

Technology Drive Street Improvements

This project involved Technology Drive Street improvements near Laguna Canyon Road between Irvine Center Drive and Sand Canyon Avenue. Project highlights: Installation of 5,770 linear feet of 24” CML&C recycled waterline including over 2,000 feet of pipeline installed within existing roadways crossing more than 120 buried utilities. Installation of 325 linear feet of 42” steel casing…Read more

RMV Multi-Purpose Path

Sukut created a multi-purpose pathway for the residents of Rancho Mission Viejo, as well as access for SMWD’s facilities, includes paving of over 2 miles of concrete / AC Paving.Read more

© 2021 Sukut Construction, LLC. All Rights Reserved.

Designed and managed by mediadozer.com

CALL NOW