State Route 4 Wagon Trail Realignment, Phase 1 Project

This project will reconstruct approximately three miles of State Route 4 in Calaveras County, east of Copperopolis, CA, by modifying the roadway’s existing horizontal and vertical curves, widening the shoulders, and adding turnouts. The purpose of these improvements is to reduce the number and severity of collisions along this stretch of roadway. The existing two-lane…Read more

North Indio Flood Control Phase 2 Project

Sukut is constructing 16,000 linear feet of a flood control channel, with over 100,000 cubic yards of concrete placement and more than one million cubic yards of excavation. The new channel crosses six existing public streets and requires the construction of reinforced concrete box culverts, utility relocations, and street reconstruction. The new channel includes 2,500…Read more

Palm Springs MDP Line 41 Stage 3 and 4 Project

On this project, Sukut is constructing approximately 6,000 linear feet of underground reinforced concrete pipe storm drain ranging in sizes from 18 to 108 inches and a six-acre detention basin with 220,000 cubic yards of export. The storm drain line will require the construction of numerous concrete structures, including manholes, drop inlets, catch basins, junction…Read more

Lower Elkhorn Interior Drainage Project

Sacramento Area Flood Control Agency contracted Sukut to construct a 750,000-cubic yard detention basin. During the project, Sukut performed 250 acres of clearing, grubbing, and stripping of topsoil and native vegetation, as well as constructing a new 7.5-mile-long channel and widening the existing channel with over 250,000 cubic yards of excavation. Sukut also installed over…Read more

CalTrans Highway 29 Project

Sukut completed this three-mile-long highway realignment project that included over 400,000 cubic yards of roadway excavation, roughly 420,000 cubic yards of rock excavation, and 40,000 cubic yards of controlled blasting. In total, Sukut moved nearly 900,000 cubic yards of rock and soil, with 350,000 cubic yards of the material being exported to various locations. Sukut…Read more

Walteria Retention Basin Improvements Phase 1 Project

This project involves pump station upgrades, channel repairs, basin improvements, and the performance of other appurtenant work. Additionally, Sukut will perform access road improvements, erosion stabilization, and installation of landscaping and irrigation systems.Read more

Oasis In-Lieu Recharge Phase II Project

Sukut is constructing approximately 17.5 miles of pipelines of  various  diameters, ranging from 66 down to eight inches.  The project also includes the construction of four pump stations with furnishings and  the installation of 15 vertical turbine pumps up to 300 horsepower and four backup generators up to 1,500 kW. Additionally, Sukut  is constructing four…Read more

L-4 Pump Station Relocation, Phase II Project

Working for Coachella Valley Water District, Sukut is relocating the L-4 Pump Station east from its current location to a point on the north side of the All American Canal, just west of Jefferson Street in the city of La Quinta, California. The new pump station contains a steel-framed control building, three 125 horsepower pumps,…Read more

Oasis In-Lieu Recharge Project

The project consisted of a 60 AF reservoir, 2835 linear feet of 72-inch steel pipeline, the Oasis Tower bypass system, irrigation lateral 97.1 Tie-In, and a reinforced concrete control structure that includes pumps, motors, valves, couplings and appurtenances. The work also included a reservoir liner, and electrical and surface restoration.Read more

© 2024 Sukut Construction, LLC. All Rights Reserved.

Designed and managed by PushMyWeb

CALL NOW