Projects

FRB Landfill East Flank Northern Diverted Channel Project
This project involves mass grading and concrete construction work to build ...
Read More
FRB Phase VIIIB Fire Repair Project
This project includes the removal and replacement of damaged geosynthetic ...
Read More
Northern Branch for the 2020 Fire Debris and Tree Removal Project
Sukut Construction has formed a joint venture (JV) with Pacific States and ...
Read More
Tree Removal Services Project for the Camp Fire in Butte County
Acting as a Managing Partner, Sukut entered into a joint venture with Odin ...
Read More
Badlands Landfill C2P5 and C3P2 Liner Expansion Project
This project involves over 10,000 cubic yards of excavation and engineered ...
Read More
Altamont Landfill – FA 2 Phase 3 Cell Construction & Stormwater Improvements
This phase of the Altamont project includes excavation of 2.6 million cubic ...
Read More
Riverside County Landfills Daily Cover Excavation and On-Call Improvements Project
This project consists of 200,000 cubic yards of daily cover excavation and ...
Read More
Visalia Landfill Phase 4 Expansion Project
This project includes mass excavation of 355,000 cubic yards of material ...
Read More
Sunshine Canyon Landfill CC-4 Part 4A Mass Excavation and Liner Project
This project includes the construction of a 4.5-acre cell, which consists ...
Read More
Disaster Debris Removal and Disposal Services Project
This project is for the on-call services to respond to any natural ...
Read More
Landfill, Disposal Site and Waste Tire Site Remediation Project
Sukut has been awarded a three-year contract by Cal Recycle for Landfill, ...
Read More
Ox Mountain Landfill Phase XXI Liner Project
This project involves the excavation of 100,000 cubic yards of hard rock to ...
Read More
Keller Canyon Landfill Phase 3C Liner System Project
This six-acre cell construction project includes 30,000 cubic yards of ...
Read More
Prima Capistrano Greenery Project
This project involves moving over 100,000 cubic yards of dirt and providing ...
Read More
FRB Bee Canyon Greenery Project
This project consists of 740,000 cubic yards of earthwork, construction of ...
Read More
FRB Landfill Wetlands Basin Repair Project
Sukut will remediate the damage caused by a breach in a wetlands basin ...
Read More
Sunshine Canyon Office Relocation Project
This project’s intent was to relocate existing offices to a new location. ...
Read More
El Sobrante Landfill Phase 12 Liner and LCRS and Phase C2 Partial Final Closure Project
This is a combination of two projects. The first project is a 10-acre ...
Read More
California Street Landfill Phase 4 Expansion Project
On this project, Sukut is constructing a new landfill cell, including mass ...
Read More
San Timoteo Sanitary Landfill Unit 2 Phases 3-2 and 4 Groundwater Protection System Composite Liner Construction project
The work on this project includes excavation of up to two million cubic ...
Read More
Calabasas Landfill Project
Sukut is working at this emergency liner repair project in Agoura, CA. The ...
Read More
Sycamore Landfill Project
Sukut is working on a landfill expansion at the Sycamore Canyon Landfill. ...
Read More
Sonoma Landfill CC-3 Construction Project
This landfill expansion project consists of 20,000 cubic yards of ...
Read More
Altamont Landfill FA2 Phases 2 and 2B Containment, and Phase 3 Expansion Project
The project includes excavation of 1.4 million cubic yards of soil needed ...
Read More
Chiquita Canyon Landfill C6 Liner Project
The project included excavation of 1 million cubic yards of soil for the ...
Read More
Sunshine Canyon DWP Waterline Project
The project consists of replacing the landfill’s existing HDPE ...
Read More
Butte Fire Debris Removal Project
The Butte Fire that started on September 9, burned 70,868 acres. In the ...
Read More
Sunshine Canyon Landfill CC-4P3 Liner Construction Project
This mass excavation project consists of 700,000 cubic yards of material to ...
Read More
Camp Fire Debris Removal Cleanup Project
Sukut entered into a joint venture with Goodfellow Bros. and Pacific States ...
Read More
El Sobrante LF Phase C 1 Partial Final Closure Project
This project for Waste Management consists of approximately 1.5 million ...
Read More
Mid Valley Landfill Unit 4 Ph 1 Liner Construction
The project includes installation of 24-inch thick low permeability ...
Read More
Clear Lake Shoreline Cleanup
This project involved an emergency cleanup of wildfire debris that was ...
Read More
Frank R. Bowerman Landfill Crews Quarters and Storage Facility
The project consisted of the design, permitting and construction of modular ...
Read More
FRB Groundwater Protection System
Sukut performed work on the Groundwater Protection System project, ...
Read More
Olinda Alpha Landfill Phase 2
Sukut continued work at the active Olinda Alpha Landfill with the Phase 2 ...
Read More
Altamont LF – Compost Facility Grading & Drainage
Sukut Construction worked closely with subcontractors to move in excess of ...
Read More
Wildfire Post Debris Removal
Sukut has been contracted by the California Governor’s Office of Emergency ...
Read More
Fink Road Landfill – 2 Cell 6 Composite Liner Project
This project for Stanislaus County consists of a 17 AC expansion which ...
Read More
Savage Canyon Landfill Liner Project
The scope of work includes 430,000 cubic yards of mass excavation and ...
Read More
Sunshine Canyon Landfill Buttress
Work consists of 4 million cubic yards of excavated material along with the ...
Read More
Sunshine Canyon LF Cell CC-4 P2 Liner Project
Sukut completed a 5.8-acre cell construction, consisting of a five-layer ...
Read More
The Sunshine Canyon Landfill Vegetative Cover Project
The Sunshine Canyon Landfill Vegetative Cover Project consists of placing ...
Read More
Santa Rosa/Napa Fire Debris Cleanup Project
Sukut Construction was awarded the Santa Rosa/Napa Fire Debris Cleanup ...
Read More
Salton City Landfill Phase 1B Cell Construction
Sukut Construction was awarded the Salton City Landfill Phase 1B Cell ...
Read More
Thomas Fire Project
Thomas Fire was the largest fire in the state of California that destroyed ...
Read More
Detwiler Fire Debris Removal and Recovery
The project scope includes removal, storage, transportation, and disposal ...
Read More
Prima Deshecha Landfill Zone 1 Phase D Mass Excavation and Liner Project
The project consists of construction of a composite liner system including ...
Read More
Lancaster Landfill Liner Phase 1b and 1c
Liner expansion construction included mass excavation, engineered fill, ...
Read More
FRB Landfill Main Haul Road Crossing Repair
Sukut completed emergency repair of the storm drain inlet and road crossing ...
Read More
Mid-Valley Landfill and Liner Expansion
Mid Valley landfill is an active municipal landfill that opened Unit Three ...
Read More
Newberry and Yermo Sanitary Landfills
Sukut Construction excavated and stockpiled 60,000 cubic yards of soil. We ...
Read More
Palmdale Water Reclamation Plant
Palmdale Water Reclamation Plant Stage Five Effluent Management Facilities ...
Read More
San Bernardino County Fire Response – Grass Valley
This project consisted of a massive debris removal operation for 284 homes ...
Read More
Lancaster Water Treatment Plant
Sukut constructed four, 70-acre waste water treatment ponds. This project ...
Read More
Carson Marketplace
Read More
Frank R. Bowerman Landfill
Located in Irvine, Sukut developed a new landfill cell including mass earth ...
Read More
Steel Mill Slag Pile
Sukut Construction excavated the existing slag pile to a designed sub ...
Read More
Prima Deshecha – Landfill
This project supported the landfill expansion and placement of liners in ...
Read More
Guadalupe Landfill
Guadalupe Landfill is an active landfill utilizing an active landfill gas ...
Read More
Jamestown Landfill Closure
Jamestown landfill is an inactive landfill that was originally closed in ...
Read More

San Timoteo Sanitary Landfill
Sukut Construction has provided the San Bernardino County with landfill ...
Read More
Rancho Bernardo – FR
This project consisted of a massive debris removal operation for homes that ...
Read More
Tracy Tire Fire Site Remediation Services
After burning for two and one-half years, Sukut was called upon to ...
Read More
Puente Hills Landfill Slope Stabilization and Roads
Sukut Construction has been involved for many years with the Puente Hills ...
Read More
Lake Tahoe Fire Response
Sukut was part of a CIWMB response team that completed the Angora Debris ...
Read More
Phelan Sanitary Landfill
Final landfill closure construction efforts for the Phelan Landfill ...
Read More
West Miramar Landfill
Sukut Construction was contracted by the City of San Diego to perform final ...
Read More