Projects
![](https://sukut.com/wp-content/uploads/2024/03/3-670x400.jpg)
El Sobrante Landfill Mine Reclamation and Cell 13B Excavation Project
The work is split up into two projects. The first project includes the ...
Read More![](https://sukut.com/wp-content/uploads/2024/02/3-670x400.jpg)
Badlands Sanitary Landfill, Phase 2 Stage 1 Liner Expansion Project
The project on this 98-acre site involves 3,000,000 cubic yards of ...
Read More![](https://sukut.com/wp-content/uploads/2023/07/Prima-Deshecha-Landfill-Infrastructure-Phase-1A-670x400.jpg)
Prima Deshecha Landfill, Infrastructure Phase 1A Project
Sukut is constructing additional on and off-ramps for Orange County Waste ...
Read More![](https://sukut.com/wp-content/uploads/2023/03/Altamont-LF-FA2-Phases-6-and-7-project-670x400.jpg)
Altamont Landfill FA2 Phases 6 and 7 Project
Sukut is working on this two-year contract that includes two phases of cell ...
Read More![](https://sukut.com/wp-content/uploads/2023/03/OAL-Landfill-Gas-Header-Upgrade-Phase-1-Project-670x400.jpg)
OAL Landfill Gas Header Upgrade Phase 1 Project
On this project, Sukut is installing approximately 4,000 linear feet of ...
Read More![](https://sukut.com/wp-content/uploads/2022/12/LLF-0220-670x400.jpg)
Landers Sanitary Landfill Phase 1A Project
Sukut constructed the Phase 1A cell expansion of the Landers Landfill for ...
Read More![](https://sukut.com/wp-content/uploads/2022/12/FRB-Groundwater-Phase-VIII-A1-670x400.jpg)
FRB Landfill Phase VIII-A1 Groundwater Protection Project
Sukut is constructing the Phase VIII-A1 groundwater protection liner system ...
Read More![](https://sukut.com/wp-content/uploads/2022/10/1-670x400.jpg)
Colton Sanitary Landfill Project
The project includes the installation of four million square feet of 50 mil ...
Read More![](https://sukut.com/wp-content/uploads/2022/08/FRB-Landfill-Sewer-and-Water-Line-Treatment-System-Design-Build-Project-670x400.jpg)
FRB Landfill Sewer and Water Line Treatment System Design-Build Project
The primary objective of this project is to contain Frank R. Bowerman ...
Read More![](https://sukut.com/wp-content/uploads/2022/06/altamont-FA2-Ph-5-and-pond-670x400.jpg)
Altamont Landfill FA2 Phase 5 and Compost Facility Contact Water Pond 2 Project
Sukut performed landfill improvements by excavating roughly 600,000 cubic ...
Read More![](https://sukut.com/wp-content/uploads/2022/05/Keller-Canyon-Cell-Phase-2F-Project-670x400.jpg)
Keller Canyon Cell Phase 2F Project
This seven-acre cell construction project involved the excavation of ...
Read More![](https://sukut.com/wp-content/uploads/2022/05/Olinda-Alpha-Phase-1A-Valencia-Greenery-Project-670x400.jpg)
Olinda Alpha Phase 1A Valencia Greenery Project
The project includes the construction of a compost greenery at the Olinda ...
Read More![](https://sukut.com/wp-content/uploads/2022/05/American-Avenue-Disposal-Site-Phase-1-Waste-Relocation-Project-670x400.jpg)
American Avenue Disposal Site Phase 1 Waste Relocation Project
The work consists of the relocation of buried wastes currently located ...
Read More![](https://sukut.com/wp-content/uploads/2022/05/North-County-Landfill-Area-6-Recycling-Center-and-Sanitary-Landfill-Project-670x400.jpg)
North County Landfill Area 6 Recycling Center and Sanitary Landfill Project
The project included 250,000 cubic yards of excavation to stockpile and ...
Read More![](https://sukut.com/wp-content/uploads/2022/04/Barstow-Sanitary-Landfil-Liner-1B-Project-670x400.jpg)
Barstow Sanitary Landfill Liner 1B Project
This project included excavating 460,000 cubic yards of earth, installing ...
Read More![](https://sukut.com/wp-content/uploads/2022/04/Guadalupe-Recycling-and-Disposal-Phase-3-Module-IV-Base-Liner-Project-670x400.jpg)
Guadalupe Recycling and Disposal Phase 3 Module IV Base Liner Project
The project included the excavation of 170,000 cubic yards to stockpile and ...
Read More![](https://sukut.com/wp-content/uploads/2022/03/Vasco-Road-Landfill-DU-13B-Cell-Construction-2022-Project-670x400.jpg)
Vasco Road Landfill DU-13B Cell Construction 2022 Project
The project included excavation and stockpiling of 175,000 cubic yards of ...
Read More![](https://sukut.com/wp-content/uploads/2021/11/Antelope-Valley-Public-landfill-Cell-Phase-V-B-670x400.jpg)
Antelope Valley Public Landfill Cell Phase V-B Project
This project for Waste Management consisted of 1.5 million cubic yards of ...
Read More![](https://sukut.com/wp-content/uploads/2021/11/El-Sobrante-landfill-Phase-13A-Liner-Leachate-collection-system-670x400.jpg)
El Sobrante Landfill Phase 13A Liner and Leachate Collection System Project
On this project, Sukut performed work that included excavation, fine grade, ...
Read More![](https://sukut.com/wp-content/uploads/2021/09/Prima-Deshecha-LF-Zone-4-Habitat-Mitigation-project-670x400.jpg)
Prima Deshecha Landfill Zone 4 Habitat Mitigation Project
Sukut performed drainage improvements at the Prima Deshecha Landfill which ...
Read More![](https://sukut.com/wp-content/uploads/2021/09/Prima-Deshecha-LF-Zone-1-Phase-D2-Liner-Groundwater-project-670x400.jpg)
Prima Deshecha Landfill Zone 1 Phase D2 Liner and Groundwater Project
Sukut worked on the expansion of the groundwater protection liner system at ...
Read More![](https://sukut.com/wp-content/uploads/2021/09/IMG_4196-670x400.jpg)
Prima Deshecha Landfill Fee Booth Relocation and Entrance Improvements CMAR Project
Acting as a CMAR, Sukut made significant infrastructure upgrades to the ...
Read More![](https://sukut.com/wp-content/uploads/2021/07/ESLF-0607-670x400.jpg)
El Sobrante Landfill Phase 13A Project
This project included clearing, excavating 4,500,000 cubic yards of ...
Read More![](https://sukut.com/wp-content/uploads/2021/03/ALF-0029-670x400.jpg)
Altamont Landfill FA2 Phase 4 Project
This project included the excavation of 1,300,000 million cubic yards of ...
Read More![](https://sukut.com/wp-content/uploads/2020/12/CWFC-0634-670x400.jpg)
Northern Branch for the 2020 Fire Debris and Tree Removal Project
Sukut entered into a joint venture with Pacific States Environmental ...
Read More![](https://sukut.com/wp-content/uploads/2020/11/Camp-Fire-Tree-Removal-project-670x400.jpg)
Tree Removal Services Project for the Camp Fire in Butte County
Acting as a Managing Partner, Sukut entered into a joint venture with Odin ...
Read More![](https://sukut.com/wp-content/uploads/2020/10/Badlands-Landfill-C2P5-and-C3P2-Liner-Expansion-Project-670x400.jpg)
Badlands Landfill C2P5 and C3P2 Liner Expansion Project
This project involved over 10,000 cubic yards of excavation and engineered ...
Read More![](https://sukut.com/wp-content/uploads/2020/06/Disaster-Debris-Removal-and-Disposal-Services-Project-670x400.jpg)
Disaster Debris Removal and Disposal Services Project
This project is for the on-call services to respond to any natural ...
Read More![](https://sukut.com/wp-content/uploads/2020/03/Prima-Capistrano-Greenery-Project-670x400.jpg)
Prima Capistrano Greenery Project
This project involved moving over 100,000 cubic yards of dirt and providing ...
Read More![](https://sukut.com/wp-content/uploads/2020/01/FRBBC-0259-670x400.jpg)
FRB Bee Canyon Greenery Project
This project consisted of 740,000 cubic yards of earthwork, construction of ...
Read More![](https://sukut.com/wp-content/uploads/2019/09/El-Sobrante-Landfill-Phase-12-Liner-LCRS-and-Phase-C2-Partial-Final-Closure-project-670x400.jpg)
El Sobrante Landfill Phase 12 Liner and LCRS and Phase C2 Partial Final Closure Project
This is a combination of two projects. The first project was a 10-acre ...
Read More![](https://sukut.com/wp-content/uploads/2019/08/STLF-0669-670x400.jpg)
San Timoteo Sanitary Landfill Unit 2 Phases 3-2 and 4 Groundwater Protection System Composite Liner Construction project
The work on this project included excavation of up to two million cubic ...
Read More![](https://sukut.com/wp-content/uploads/2019/04/altamont-1-670x400.jpg)
Altamont Landfill FA2 Phases 2 and 2B Containment, and Phase 3 Expansion Project
The project included the excavation of 1.4 million cubic yards of soil ...
Read More![](https://sukut.com/wp-content/uploads/2019/04/Chiquita-Canyon-Landfill-C6-Liner-670x400.jpg)
Chiquita Canyon Landfill C6 Liner Project
The project included the excavation of one million cubic yards of soil for ...
Read More![](https://sukut.com/wp-content/uploads/2019/03/Court-House-2-670x400.jpg)
Butte Fire Debris Removal Project
The Butte Fire that started on September 9, burned 70,868 acres. In the ...
Read More![](https://sukut.com/wp-content/uploads/2019/03/IMG_7091-670x400.jpg)
Sunshine Canyon Landfill CC-4P3 Liner Construction Project
This mass excavation project consisted of 700,000 cubic yards of material ...
Read More![](https://sukut.com/wp-content/uploads/2019/02/Camp-Fire-Debris-Removal-Cleanup-NEW-670x400.jpg)
Camp Fire Debris Removal Cleanup Project
Sukut entered into a joint venture with Goodfellow Bros. and Pacific States ...
Read More![](https://sukut.com/wp-content/uploads/2018/11/El-Sobrante-Landfill-–-Phase-C-PFC-670x400.jpg)
El Sobrante LF Phase C 1 Partial Final Closure Project
This project for Waste Management consisted of approximately 1.5 million ...
Read More![](https://sukut.com/wp-content/uploads/2018/09/MVLF190912-0086-670x400.jpg)
Mid Valley Landfill Unit 4 Ph 1 Liner Construction
The project included the installation of 24-inch thick low permeability ...
Read More![](https://sukut.com/wp-content/uploads/2018/08/1253-Clearlake-Shoreline-2-670x400.jpg)
Clear Lake Shoreline Cleanup
This project involved an emergency cleanup of wildfire debris that was ...
Read More![](https://sukut.com/wp-content/uploads/2018/07/1221-3-670x400.jpg)
Olinda Alpha Landfill Phase 2
Sukut continued work at the active Olinda Alpha Landfill with the Phase 2 ...
Read More![](https://sukut.com/wp-content/uploads/2018/07/1277-3-670x400.jpg)
Wildfire Post Debris Removal
Sukut has been contracted by the California Governor’s Office of Emergency ...
Read More![](https://sukut.com/wp-content/uploads/2018/03/Santa-Rosa-and-Napa-Fire-Debris-Cleanup-Project-670x400.jpg)
Santa Rosa/Napa Fire Debris Cleanup
Sukut Construction was awarded the Santa Rosa/Napa Fire Debris Cleanup ...
Read More![](https://sukut.com/wp-content/uploads/2018/03/Thomas-fire-1-e1522777759356-670x400.jpg)
Thomas Fire Project
At the beginning of 2018, Sukut was contracted by CalRecycle to perform the ...
Read More![](https://sukut.com/wp-content/uploads/2018/03/Detwiller-1241-670x400.jpg)
Detwiler Fire Debris Removal and Recovery
The project scope included the removal, storage, transportation, and ...
Read More![](https://sukut.com/wp-content/uploads/2018/03/Prima-Deshecha-Landfill-Zone-1-Phase-D-Mass-Excavation-and-Liner-Project-670x400.jpg)
Prima Deshecha Landfill Zone 1 Phase D Mass Excavation and Liner Project
The project consisted of the construction of a composite liner system ...
Read More![](https://sukut.com/wp-content/uploads/2013/11/Frank-Bowerman-Landfill-1-of-1-670x400.jpg)
Frank R. Bowerman Landfill
Located in Irvine, Sukut developed a new landfill cell including mass earth ...
Read More![](https://sukut.com/wp-content/uploads/2013/02/Prima-Descheca-Landfill-1-of-1-5-670x400.jpg)
Prima Deshecha – Landfill
This project supported the landfill expansion and placement of liners in ...
Read More![](https://sukut.com/wp-content/uploads/2008/03/Tracy-Tire-Fire.3-Rainbow4_12X9-670x400.jpg)
Tracy Tire Fire Site Remediation Services
After burning for two and one-half years, Sukut was called upon to ...
Read More