Projects

Keller Canyon Landfill Phase 3C Liner System Project

This six-acre cell construction project includes 30,000 cubic yards of ...

Read More

Prima Capistrano Greenery Project

This project involves moving over 100,000 cubic yards of dirt and providing ...

Read More

FRB Bee Canyon Greenery Project

This project consists of 740,000 cubic yards of earthwork, construction of ...

Read More

FRB Landfill Wetlands Basin Repair Project

Sukut will remediate the damage caused by a breach in a wetlands basin ...

Read More

Sunshine Canyon Office Relocation Project

This project’s intent is to relocate existing offices to a new location. ...

Read More

El Sobrante Landfill Phase 12 Liner and LCRS and Phase C2 Partial Final Closure Project

This is a combination of two projects. The first project is a 10-acre ...

Read More

California Street Landfill Phase 4 Expansion Project

On this project, Sukut is constructing a new landfill cell, including mass ...

Read More

San Timoteo Sanitary Landfill Unit 2 Phases 3-2 and 4 Groundwater Protection System Composite Liner Construction project

The work on this project includes excavation of up to two million cubic ...

Read More

Calabasas Landfill Project

Sukut is working at this emergency liner repair project in Agoura, CA. The ...

Read More

Sycamore Landfill Project

Sukut is working on a landfill expansion at the Sycamore Canyon Landfill. ...

Read More

Sonoma Landfill Project

This landfill expansion project consists of 20,000 cubic yards of ...

Read More

Altamont Landfill FA2 Phases 2 and 2B Containment, and Phase 3 Expansion Project

The project includes excavation of 1.4 million cubic yards of soil needed ...

Read More

Chiquita Canyon Landfill C6 Liner Project

The project includes excavation of 1 million cubic yards of soil for the ...

Read More

Sunshine Canyon DWP Waterline Project

The project consists of replacing the landfill’s existing HDPE ...

Read More

Butte Fire Debris Removal Project

The Butte Fire that started on September 9, burned 70,868 acres. In the ...

Read More

Sunshine Canyon Landfill CC-4P3 Liner Construction Project

This mass excavation project consists of 700,000 cubic yards of material to ...

Read More

Camp Fire Debris Removal Cleanup Project

Sukut entered into a joint venture with Goodfellow Bros. and Pacific States ...

Read More

El Sobrante LF Phase C Partial Final Closure Project

The project consists of 1.6 million cubic yards of rock excavation to fill ...

Read More

Mid Valley Landfill Unit 4 Ph 1 Liner Construction

The project includes installation of 24-inch thick low permeability ...

Read More

Clear Lake Shoreline Cleanup

This project involved an emergency cleanup of wildfire debris that was ...

Read More

Frank R. Bowerman Landfill Crews Quarters and Storage Facility

The project consisted of the design, permitting and construction of modular ...

Read More

FRB Groundwater Protection System

Sukut performed work on the Groundwater Protection System project, ...

Read More

Olinda Alpha Landfill Phase 2

Sukut continued work at the active Olinda Alpha Landfill with the Phase 2 ...

Read More

Altamont LF – Compost Facility Grading & Drainage

Sukut Construction worked closely with subcontractors to move in excess of ...

Read More

Wildfire Post Debris Removal

Sukut has been contracted by the California Governor’s Office of Emergency ...

Read More

Fink Road Landfill – 2 Cell 6 Composite Liner Project

This project for Stanislaus County consists of a 17 AC expansion which ...

Read More

Savage Canyon Landfill Liner Project

The scope of work includes 430,000 cubic yards of mass excavation and ...

Read More

Sunshine Canyon Landfill Buttress

Work consists of 4 million cubic yards of excavated material along with the ...

Read More

Sunshine Canyon LF Cell CC-4 P2 Liner Project

Sukut completed a 5.8-acre cell construction, consisting of a five-layer ...

Read More

The Sunshine Canyon Landfill Vegetative Cover Project

The Sunshine Canyon Landfill Vegetative Cover Project consists of placing ...

Read More

Santa Rosa/Napa Fire Debris Cleanup Project

Sukut Construction was awarded the Santa Rosa/Napa Fire Debris Cleanup ...

Read More

Salton City Landfill Phase 1B Cell Construction

Sukut Construction was awarded the Salton City Landfill Phase 1B Cell ...

Read More

Thomas Fire Project

Thomas Fire was the largest fire in the state of California that destroyed ...

Read More

Detwiler Fire Debris Removal and Recovery

The project scope includes removal, storage, transportation, and disposal ...

Read More

Prima Deshecha Landfill Zone 1 Phase D Mass Excavation and Liner Project

The project consists of construction of a composite liner system including ...

Read More

Lancaster Landfill Liner Phase 1b and 1c

Liner expansion construction included mass excavation, engineered fill, ...

Read More

FRB Landfill Main Haul Road Crossing Repair

Sukut completed emergency repair of the storm drain inlet and road crossing ...

Read More

Mid-Valley Landfill and Liner Expansion

Mid Valley landfill is an active municipal landfill that opened Unit Three ...

Read More

Newberry and Yermo Sanitary Landfills

Sukut Construction excavated and stockpiled 60,000 cubic yards of soil. We ...

Read More

Palmdale Water Reclamation Plant

Palmdale Water Reclamation Plant Stage Five Effluent Management Facilities ...

Read More

San Bernardino County Fire Response – Grass Valley

This project consisted of a massive debris removal operation for 284 homes ...

Read More

Lancaster Water Treatment Plant

Sukut constructed four, 70-acre waste water treatment ponds. This project ...

Read More

Carson Marketplace

Read More

Frank R. Bowerman Landfill

Located in Irvine, Sukut developed a new landfill cell including mass earth ...

Read More

Steel Mill Slag Pile

Sukut Construction excavated the existing slag pile to a designed sub ...

Read More

Prima Deshecha – Landfill

This project supported the landfill expansion and placement of liners in ...

Read More

Guadalupe Landfill

Guadalupe Landfill is an active landfill utilizing an active landfill gas ...

Read More

Jamestown Landfill Closure

Jamestown landfill is an inactive landfill that was originally closed in ...

Read More

Calabasas Landfill

This 35-acre project included mass excavation, installation of an ...

Read More

San Timoteo Sanitary Landfill

Sukut Construction has provided the San Bernardino County with landfill ...

Read More

Rancho Bernardo – FR

This project consisted of a massive debris removal operation for homes that ...

Read More

Tracy Tire Fire Site Remediation Services

After burning for two and one-half years, Sukut was called upon to ...

Read More

Puente Hills Landfill Slope Stabilization and Roads

Sukut Construction has been involved for many years with the Puente Hills ...

Read More

Lake Tahoe Fire Response

Sukut was part of a CIWMB response team that completed the Angora Debris ...

Read More

Phelan Sanitary Landfill

Final landfill closure construction efforts for the Phelan Landfill ...

Read More

West Miramar Landfill

Sukut Construction was contracted by the City of San Diego to perform final ...

Read More

© 2020 Sukut Construction LLC. All Rights Reserved.

Designed and managed by mediadozer.com

CALL NOW